Similar Projects
Barkley Extension - City of Albany
Infrastructure
Conception
$969,354 CJ est. value
Albany, GA 31705

North Washington Extension - City of Albany
Infrastructure
Conception
$250,000 CJ est. value
Albany, GA 31701

Oglethorpe Bridge / SR 520 BU at Flint River
Demolition, New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Albany, GA 31705

SR 91 From SR 234 to Lee County Line
Infrastructure
Design
$5,000,000 CJ est. value
Albany, GA 31701

Milling, Plant Mix Resuracing and Shoulder Rehabilitation on SR 520
Infrastructure
Bidding
$2,000,000 CJ est. value
Albany, GA 31705

Lift Station 66 and 88 Rehabilitation
Infrastructure
Bidding
$800,000 CJ est. value
Albany, GA 31701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Albany Pipe Rehabilitation
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Albany, GA 31701

Construction of Fleet Tire Shop
New Construction, Infrastructure
Results
$419,000 CJ est. value
Albany, GA 31705

401 Pine Parking Improvements
Infrastructure
Results
$374,859 CJ est. value
Albany, GA 31701

Albany State University Nursing and Health Science Simulation Lab Facility
New Construction, Infrastructure - 20,000 SF
Construction
$8,000,000 CJ est. value
Albany, GA 31705

Widening on SR 133
Infrastructure
Construction
$43,353,383 CJ est. value
Albany, GA 31705

Jefferson Street Living and Learning Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Albany, GA 31701

Chehaw Improvements - City of Albany
Renovation, Infrastructure
Conception
$330,930 CJ est. value
Albany, GA 31701

SR 234 From CR 1645 / Byron Ridge Drive to SR 520bu
Infrastructure
Design
$7,000,000 CJ est. value
Albany, GA 31721

Last Updated 10/17/2023 03:03 AM
Project Title

Joshua Street Water Pollution Control Plant Combined Sewer Overflow (CSO) Bypass Modifications

Physical Address View project details and contacts
City, State (County) Albany, GA 31701   (Dougherty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work for this project aims to provide a separate combined sewer overflow (CSO) Treatment Train for JSWPCP to provide minimum treatment to CSO Flows as required by the CSO NPDES Permit for the plant. It also includes the rehabilitation of several existing process units in order to replace equipment that has reached its useful life, provide additional redundancy, and restore existing processes that are no longer functional. The City of Albany reserves the right to reject any and all bids and to waive any informalities in the bidding process. For additional information, contact Ricky Gladney, Buyer, at (229) 431-3211. Submit all questions via email to rqladney@albanyqa.gov cc: jswilliams@albanyqa.gov and kross@albanyqa.gov. The deadline for questions is Friday, November 03, 2023, at 2:30 P.M. Questions received after this deadline may not be answered. Replies of substance will be in the form of written addenda and de available to all potential bidders. Liquidated Damages: Time is an essential element of the Contract, and any delay in the prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with business. In addition to the aforementioned inconveniences, any delay in completion of The Work will always increase the cost of engineering and could subject the City to permit compliance penalties. For this reason, it is important that The Work be pressed vigorously to completion for each substantial completion milestone. Should the Contractor or, in case of default, the Surety fail to complete The Work within the time stipulated in the Contract or within such extra time that may be allowed, charges shall be assessed against any money due or that may become due the Contractor in accordance with the rates detailed below. Substantial completion five hundred dollars ($500) per calendar day

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents