Similar Projects
Pier 97 Building Plumbing Construction
Alteration
Post-Bid
New York, NY 10014

Disconnecting and Reconnecting of Gas Stoves at Various Manhattan Development
Alteration
Post-Bid
Manhattan, NY

Rehabilitate Elevators, Buildings 4 and 5 - Plumbing
Infrastructure
Results
$100,000 to $250,000 est. value
New York, NY 10032

Basement Restroom
Renovation, Demolition
Results
$50,000 to $500,000 est. value
New York, NY 10036

Job Order Contracting Region 1 Plumbing
Term Contract
Post-Bid
$5,000,000 est. value

Job Order Contract For South Region Plumbing
Term Contract
Results
Brooklyn, New York, North Creek, Staten Island, NY 10065

Contract For Plumber Services, Time, And Material
Term Contract
Post-Bid
$90,000 to $999,000 est. value
Bronx, Brooklyn, New York, NY 10065

HS 304M - Rpz Backflow Prevention Devices
Alteration
Results
$500,000 to $750,000 est. value
NY 10030

General, Electrical, Plumbing, Building & Yard Emergency Services At LNA Service Stations
Term Contract
Post-Bid

Bellevue Plumbing Fixtures Replacement
Renovation
Results
$1,469,033 CJ est. value
New York, NY 10007

Plumbing Job Order Contract Citywide
Alteration
Post-Bid
New York, NY

Wellhead Treatment for Newly Regulated Contaminants at Plant No. 8 - Contract W - Well Pump Construction
Renovation
Results
$156,750 CJ est. value
New York, NY 10007

Plumbing Services
Term Contract
Post-Bid
New York, NY

Citywide Pool Plumbing Reconstruction
Renovation
Results
$3,457,221 CJ est. value
New York, NY 10007

Re-bid Job Order Contracts Plumbing Work
Term Contract
Post-Bid
New York, NY 10007

Last Updated 01/30/2023 03:25 PM
Project Title

Aquatics Locker Room Rehabilitation - Plumbing Contract

Physical Address View project details and contacts
City, State (County) New York, NY 10031   (New York County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,360,683 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 30, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Question Deadline 11/22/2022 at 1:00 PM ET Sealed bids for General Construction, Mechanical Construction, Electrical Construction and Plumbing Construction at the Aquatics Facility of Denny Farrell Riverbank State Park, 679 Riverside Drive, New York, New York. 1. Mobilization and establishment of site perimeter fencing and maintenance and protection of existingconditions. 2. General demolition and removals of partitions, finishes, accessories, and fixtures within the aquaticslocker rooms, showers, and restrooms and staff areas. 3. General demolition and removals of damaged exterior tiles at West Stair Tower. 4. Provide and install temporary restroom trailers and necessary electrical and plumbing accessories duringconstruction. 5. Provide and install temporary rinse showers on pool deck and necessary plumbing accessories duringconstruction. 6. Provide and install temporary changing tents and staff tents during construction. 7. Reconfiguration of the aquatics locker rooms and restrooms to include new gender-neutral locker room,new multipurpose room, and reconfigured staff area. 8. Rehabilitation of the existing lobby, locker rooms, and staff areas to include new accessories, fixtures,finishes, wall partitions and equipment. 9. Provide and install new finishes and fixtures within the limits of architectural scope of work. 10. Provide and install new light fixtures, public address system, smoke detectors, power & data within thelimits of electrical scope of work. 11. Provide and install new sprinklers within the limits of plumbing and fire protection scope of work. 12. Provide and install new HVAC diffusers and ductwork within the limits of mechanical scope of work. 13. Provide and install new windows in the lobby and install exterior tile patch around window. 14. Provide and install exterior patch at West Stair Tower within the limits of architectural and structuralscope of work. 15. Provide all necessary permits. 16. Closeout documents including warranties. Minority Owned Business Enterprise (MBE) 9% The completion date for this project is 270 calendar days after agreement has been approved by the NYS Comptrollers Office. The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. By submitting a bid, the Bidder agrees not to make any claim for, or have any right to, damages because of any misinterpretation or misunderstanding of the specifications, or because of any misinformation or lack of information. Bids containing false or misleading statements, or which provide project contacts that do not support an attribute or condition claimed by a Bidder, may be disqualified from consideration. If, in the opinion of OPRHP, a statement is intended to mislead OPRHP in its evaluation of the bid, and the attribute, condition, or capability is a requirement of the IFB, the bid shall be disqualified from consideration. In the event there is a tie final determination will be made by the OPRHP Deputy Commissioner for Capital. Bid modifications that are submitted in writing and signed by an authorized representative of the bidding firm will be considered for award if received by OPRHP prior to the scheduled proposal due date. Bids may be withdrawn or cancelled prior to the scheduled proposal due date. A bid may be rejected by OPRHP: if it shows any alteration of terms, conditions, or requirements; for any other irregularities; if it is incomplete, or if it offers an alternate bid not invited by the specifications. For contract opportunities subject to the approval of the Office of the State Comptroller, the protesting party may appeal OPRHPs protest determination to the Office of the State Comptroller in accordance with the regulations contained in Part 24 of Title 2 of the New York Codes, Rules and Regulations. For contract opportunities that are not subject to the approval of the Office of the State Comptroller, OPRHPs protest determination is the conclusive and final determination of the protest. Nothing in these bid protest procedures is intended to limit or impair the rights of any bidder to seek and pursue remedies of law through the judicial process. Estimate Range: $1,000,000.00 - $1,400,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents