Similar Projects
Emergency Generator and Fire Pump
Post-Bid
Shiprock, NM

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

Concrete Vaults and Pads
Results
Less than $13,284 est. value
Aztec, NM

Transmission Structures for Cottonwood
Results
Less than $413,653 est. value
Farmington, NM 87401

ARC Flash Rated Padmount Transformer
Results
Less than $126,565 est. value
Farmington, NM 87401

Wire and Cable
Results
$43,220 to $94,150 est. value
Farmington, NM 87401

Water Treatment Plant Emergency Generator Project
Results
Bloomfield, NM 87413

Voltage Regulators Multi-Term Contract
Term Contract
Results
Less than $72,689 est. value
Farmington, NM 87401

BIE/NMNN/FACMGT/3-Generators
Results
Fruitland, NM 87416

Main Street Complete Streets Wooden Poles
Results
Farmington, NM 87401

Padmount Switchgear
Results
Farmington, NM 87401

Wind Turbine Training System
Results
Farmington, NM 87402

Generator Preventive Maintenance and Repair
Term Contract
Results

Animas Substation Circuit Breakers
Results
$636,168 est. value
Farmington, NM 87401

Bluffview Substation Switchyard Equipment
Results
$46,626 est. value
Farmington, NM

Reported 02/24/2021 12:00 AM
Project Title

Bluffview-Labor Preparation Manual Transfer Switch

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Quotes for the installation of Manual Transfer Switch (MTS) Cabinet, cables and conduits for the interconnection of the alternate power source of the 2500kVA Station Service Transformer (SST). The scope of the Electrical Contractor is to provide services for the following (as a summary): 1. Installation of new conduits and cables inside the Bluffview Plant Control Room. 2. Removal of the existing conduits and cables that are connected to the Station Service Transformer. 3. Supply and install miscellaneous materials such as conduit hangers, etc. to complete the conduit layout.

Details

Division 26 - Electrical, Transfer Switches.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents