Similar Projects
Large Diameter Sanitary Sewer Multi-Sensor Inspection Service
Term Contract
Sub-Bidding
Charlotte, NC 28202

Express Deck Sign Demolition
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Charlotte, NC 28208

Siphon Cleaning Services
Term Contract
Post-Bid
Charlotte, NC 28273

Rental Of Portable Restroom Facilities
Term Contract
Post-Bid
Charlotte, NC

Inline Solids Screening Equipment Preselection
Term Contract
Sub-Bidding
Charlotte, NC 28202

Full Delivery Projects to Provide Stream and Riparian Wetland Mitigation Credits within the Cataloguing
Term Contract
Post-Bid
Charlotte, NC 28202

Cylinder Head Reconditioning Services
Term Contract
Sub-Bidding
Charlotte, NC 28202

Full Delivery Projects to Provide Non-Riparian Wetland Mitigation Credits within the Cataloguing
Term Contract
Post-Bid
Charlotte, NC 28202

Wastewater Treatment Plant (WWTP) Polymers
Term Contract
Sub-Bidding
Charlotte, NC 28202

Leak Detection Services
Term Contract
Post-Bid
Charlotte, NC 28202

Stormwater Control Measure Maintenance and Vegetation Management Services
Term Contract
Sub-Bidding
Charlotte, NC 28202

Ornamental Fountain and Splash Pad Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28202

Annual Weigh Station Scale Maintenance Contract - Charlotte I-85-Mecklenburg County
Term Contract
Post-Bid
Charlotte, NC 28216

Wayfinding and Space Signage Service
Term Contract
Post-Bid
Charlotte, NC 28202

Centrifuge Equipment Preselection
Term Contract
Post-Bid
Pineville, NC 28134

Last Updated 02/06/2023 10:13 AM
Project Title

RFQ- UNC Charlotte - Rup-2 & Fretwell HVAC & Controls

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28202   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,305,509 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

One-Two Sentences The scope of work is for upgrades to the Mechanical, Electrical and Control systems for Regional Utility Plant (RUP) 2 & Fretwell HVAC & Controls located on the UNC Charlotte Campus and further identified in the RFQ for the project.Code: 42226 Item 320 Code: 42226 Item 326 Control Systems o Upgrading the existing LON controls and Tridium JACE network controllers with SE EcoStruxure BACnet IP controllers and Automation servers (network controllers). o Removal of the existing TEKWORX Optimization package o Replace existing immersion temperature sensors (reuse existing sensor bulb wells). o Replace existing space sensors and ODA sensors. o Replace all existing flow meters, control valves and damper actuators. o Provide secondary BACnet/MSTP and/or BACnet/IP communications to DDC panels. o Conduct Retro-commissioning to identify system deficiencies, and to help with design decisions. o Design a full-scale building control system operating per the Owner approved sequence of operation. Mechanical Systems o Design or a heat pump split system to serve the restroom. o Design and specify cooling tower makeup and blowdown valves and meters. o And new domestic water meter. Electrical Systems o Design for lighting fixture (LED) upgrades in the back of house (MEP rooms, Storage rooms, IT closets, and staircases). FRETWELL Control Systems o Design controls to DDC.(currently pneumatic) o Design for replacement of all water flow meters, control valves and air damper actuators. o Design for new VAV boxes o Provide Retro-commissioning services to identify system deficiencies. o Design building control system operating per the owner-approved sequence of operations. Mechanical Systems o Conduct feasibility Study to see if we can connect CHW/HHW from RUP-5 or McEniry CHW or replace the existing Chillers. o Upgrade existing Air Handling Unit (AHU-1) to include fan walls, O/A dampers, drain pans and control valves. o Conduct Test, Adjusting, Balancing (TAB) on AHU-1 Design cooling tower makeup and blowdown valves and meters. and domestic water meter. Electrical Systems o Design new VFDs that serve Cooling Tower 1 cells, Secondary hot/chilled water pumps, chiller room exhaust fans and boiler air supply fans. o Design for lighting fixture (LED) upgrades in the back of house (MEP rooms, Storage rooms, IT closets, and staircases). The total budget for this project is $2,305,509

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents