Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

2021 Concrete Paving Rehabilitation
Post-Bid
Minneapolis, MN

CSAH 34 (Birch Street) Improvements
Results
Lino Lakes, MN 55014

CSAH 116 (Bunker Lake Boulevard) at TH 47 (St Francis Boulevard) Intersection Improvements
Results
$3,700,000 est. value
Ramsey, MN 55303

Regional Trails and Pathways Rehabilitation
Renovation
Post-Bid
Minneapolis, MN

2021 Street Improvements
Results
$2,300,000 to $2,700,000 est. value
Lino Lakes, MN

Grading, Bituminous Surfacing, Signals, ADA Improvements, TMS and Bridge No. 02552
Results
MN

Parking and Pedestrian Safety Upgrades at AMRTC - General
Results
Less than $550,000 est. value
Anoka, MN 55303

Parking and Pedestrian Safety Upgrades at AMRTC - Electrical
Results
Less than $550,000 est. value
Anoka, MN 55303

Furman Street Improvements
Results
$115,000 est. value
Columbus, MN 55025

Crooked Lake Boulevard and Robinson Drive Mill and Overlay
Results
Coon Rapids, MN 55433

Hornsby Street Reconstruction
Results
$1,800,000 to $2,000,000 est. value
Columbus, MN 55025

2021 Crack Seal Improvements
Results
$165,000 est. value
Ramsey, MN

Riverdale Drive Improvements
Results
Ramsey, MN 55303

2021 Mill and Overlay and 2021 Curb, Sidewalk and Ped Ramp Repairs
Results
$2,276,000 est. value
Anoka, MN

Last Updated 10/22/2021 04:51 PM
Project Title

Whittier Safe Routes to School

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the removal and construction at two locations around the Whittier School to provide safe pedestrian movement crossing major streets in the area. The work will include; traffic management, pavement removal and construction, manhole relocations, new storm sewer, signal work, asphalt pavement and concrete curb and gutter.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents