Similar Projects
Schedule A: Water and Wastewater Main Replacements at Various Locations, and Schedule B: University Hills Boulevard Wastewater Main Installation, and Schedule C: Luna Road from Northwest Highway to Royal Lane Water and Wastewater Main Replacements
Bidding
Dallas, TX

Fireside by the Lake, Phase 1 - Utility Improvements
Bidding
Dallas, TX 75043

Advance Metering Infrastructure (AMI) Water Meters
Post-Bid
Glenn Heights, TX 75154

Water Pipeline Construction Project for Vitruvian Park Trinity Aquifer Well
Post-Bid
Addison, TX 75001

Part 1 - Water and Wastewater Main Improvements in Ash Creek, Cedar Springs Branch, and Ledbetter Drive, Part 2 - 54" Azalea Drainage Relief Improvements
Results
$9,641,340 est. value
Dallas, TX 75216

Utility Relocation for CSJ 0430-01-057 SH 352
Results
$264,313 est. value
Mesquite, TX 75149

Utilities Contractor for a Construction Project
Post-Bid
Irving, TX

River Oaks, Cameila and Fair Court Water Improvements
Results
$739,568 est. value
Irving, TX 75014

State Highway 161 Water Improvements
Post-Bid
Irving, TX 75038

A/R/C: Utility Repair and Replacement
Term Contract
Results
$150,000 est. value
Richardson, TX 75080

The Mesa Water Distribution Improvements
Post-Bid
Glenn Heights, TX

Wilmer Water System Improvements Segment 1
Results
$1,911,078 est. value
Wilmer, TX 75172

Belt Line Road Valve Improvement at Plano Road and Yale Boulevard
Post-Bid
$487,000 est. value
Richardson, TX 75080

Silverado Phase 3-MI, 4B-2 MI, 5-MI and Valley Storage Pond Water, Sanitary Sewer and Storm Drainage Improvements
Results
Dallas, TX

Snider Plaza Utility Replacement
Post-Bid
$5,300,000 to $6,000,000 est. value
University Park, TX

Last Updated 01/11/2021 10:40 AM
Project Title

48-Inch Suction Header Repair Project

Physical Address View project details and contacts
City, State (County) Dallas, TX 75235   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is described in general, non-inclusive terms as: 1. Demolition of the north end of the 48-inch pipeline segment which serves as the High Service Pump Station (HSPS) suction header at the Park Cities Water Treatment Plant (WTP). This includes a 48-inch 90-degree bend and a 48-inch dish head flange. 2. Demolition of the 48-inch gate valve along with the associated actuator and control panel (which are located on the main floor of the Treated Water Pump Station). 3. Installation of new 48-inch blind flanges at the end connections created by this demolition work. Both blind flanges shall be outfitted with a 4-inch drain line. 4. Surface preparation and installation of an exterior carbon fiber reinforced polymer (CFRP) composite system to provide structural reinforcement and integrity for sections of the 48-inch Suction Header pipe and associated fittings (i.e., four [4] high service pump [HSP] lateral connections and one 48-inch tee). 5. Surface cleaning and recoating of the 36-inch High Pressure Main and appurtenant items that are located within the limits of the pipe trench.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents