Similar Projects
Last Updated | 12/27/2022 12:08 PM |
Project Title | RFP Engineering - CSAH 13 Corridor Improvements |
Physical Address | View project details and contacts |
City, State (County) | Stillwater, MN 55082 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work and Deliverables The following lists outline work tasks and associated items that may be included as part of the contracted services. All reports/documentation must be developed and presented in Microsoft Office and all design files must be developed and presented in Microstation adhering to Washington County approved formats unless otherwise noted or requested by the Consultant with approval of the County The role of the selected Consultant team will be to complete all tasks necessary to take the project to a municipally approved preliminary layout. Washington County will partner with the City of Woodbury and will act as the lead agency through all aspects of the project. The County's role as lead agency does not preclude direct and regular interaction between the Consultant and the City, Watershed District, and other agencies. Their input and review is important and their approval of the preliminary layout is required, however, the County is to be kept informed of agency dialogue and will assist the Consultant in determining the need and scope of interaction with a particular agency. The city will need to be involved in the design layout development and review and other intermediate completion points, and their input will be incorporated on a regular basis to avoid review delays or reworking of design elements. In the event that the submitted proposals are unacceptable, the county reserves the right to reject any and all proposals. The method of Contractor Selection has not been Determined at this time. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |