Similar Projects
Boiler Installation and Repair Service
Term Contract
Bidding
NC

HVAC Equipment Cleaning Service
Term Contract
Bidding
NC

Lochinvar Crest Condensing Boiler
Term Contract
Post-Bid
Raleigh, NC

ECSU - Mechanical System Upgrades
Post-Bid
Less than $700,000 est. value
Elizabeth City, NC 27909

Mechanical, Electrical, & Plumbing MACC
Results
Less than $240,000,000 est. value
Camp Lejeune, NC 28547

Union West Library Boiler Replacement
Results
Indian Trail, NC 28079

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Domestic Water Heater Replacement
Alteration
Bidding
Greensboro, NC 27401

South Campus Building 1000 Boiler Replacement
Post-Bid
Concord, NC 28027

Aerco Gas Boiler
Results
Less than $37,905 est. value
Raleigh, NC

Githens Boiler Replacement
Alteration
Bidding
Durham, NC 27707

Sumner Elementary Chiller Replacement Project
Post-Bid
Greensboro, NC 27406

Mechanical Maintenance and Repair Program
Term Contract
Results
Greensboro, NC 27403

Mechanical Equipment Replacements, Group 5: Building SK and SL Improvements
Alteration
Bidding
$2,800,000 est. value
Raleigh, NC

Replacement Of A Boiler At East Iredell Middle School
Post-Bid
Statesville, NC 28625

Reported 04/02/2022 12:00 AM
Project Title

Judge E. Maurice Braswell Cumberland County Courthouse Boiler Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor to disconnect all power wiring, control wiring, vent piping, and hot water piping as needed for removal and disposal of the existing Dewey-Shepard hot water boiler. 2.. Contractor to provide all labor and materials required to completely execute the installation of a new Lochinvar BWX24-680F Electric Boiler. Manufacturer’s specs attached. 3. Contractor is responsible for confirming new hot water boiler unit is sized sufficiently for building size and occupant load and will fit within existing boiler footprint. a. New hot water boiler unit should include in addition to “Standard Features”: 1. BACNet MS/TP card compatible with Cumberland County Building Automation System. 2. Short-Circuit Current Rating of 65,000 Amps. 4. Contractor to furnish and install all pipe, manual valves, and fittings as required to connect the hot water loop to the new boiler. 5. Contractor will furnish and install all pipe hangers and supports as required to support the pipe independently from the boiler. 6. Contractor will be responsible for verifying all isolation valves are in good working order and can be reused or include replacement cost in their proposal. 7. All equipment should be selected for 480v/3ph/60hz electrical service. 8. Contractor to provide detailed manufacturer’s cut sheets for specific boiler to owner prior to commencement of work. 9. Contractor to furnish all crane, rigging, and trucking as needed for this project and shall be responsible for any and all damage to equipment done during transportation, installation, and prior to turnover to Cumberland County. 10. Contractor to provide copies of all permits required to complete work to owner upon request. No work shall commence until all appropriate permits have been issued. 11. Project will not be deemed complete until Contractor has passed all required inspections, performed factory start-up per the manufacturer’s instructions, and all Controls work has been completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents