Reported | 04/02/2022 12:00 AM |
Project Title | Judge E. Maurice Braswell Cumberland County Courthouse Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28301 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Contractor to disconnect all power wiring, control wiring, vent piping, and hot water piping as needed for removal and disposal of the existing Dewey-Shepard hot water boiler. 2.. Contractor to provide all labor and materials required to completely execute the installation of a new Lochinvar BWX24-680F Electric Boiler. Manufacturer’s specs attached. 3. Contractor is responsible for confirming new hot water boiler unit is sized sufficiently for building size and occupant load and will fit within existing boiler footprint. a. New hot water boiler unit should include in addition to “Standard Features”: 1. BACNet MS/TP card compatible with Cumberland County Building Automation System. 2. Short-Circuit Current Rating of 65,000 Amps. 4. Contractor to furnish and install all pipe, manual valves, and fittings as required to connect the hot water loop to the new boiler. 5. Contractor will furnish and install all pipe hangers and supports as required to support the pipe independently from the boiler. 6. Contractor will be responsible for verifying all isolation valves are in good working order and can be reused or include replacement cost in their proposal. 7. All equipment should be selected for 480v/3ph/60hz electrical service. 8. Contractor to provide detailed manufacturer’s cut sheets for specific boiler to owner prior to commencement of work. 9. Contractor to furnish all crane, rigging, and trucking as needed for this project and shall be responsible for any and all damage to equipment done during transportation, installation, and prior to turnover to Cumberland County. 10. Contractor to provide copies of all permits required to complete work to owner upon request. No work shall commence until all appropriate permits have been issued. 11. Project will not be deemed complete until Contractor has passed all required inspections, performed factory start-up per the manufacturer’s instructions, and all Controls work has been completed. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |