Similar Projects
Elmere Treatment Plant (New) & Storage Tank - City of Meriden
New Construction, Infrastructure
Conception
$33,500,000 CJ est. value
Meriden, CT 06451

Spent Backwash Recycling Facilities at West Lake and Margerie Water Treatment Plants - City of Danbury
Renovation
Conception
$1,061,000 CJ est. value
Danbury, CT 06811

Fire Alarm and Fiber Network Upgrade
Renovation
Bidding
$250,000 CJ est. value
Waterbury, CT 06708

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

Wastewater Treatment Facility Operations and Maintenance
Renovation
Post-Bid
Killingly, CT 06239

East Hartford Water Pollution Control Facility Aeration, Do Control, and Scada Upgrades - Phase 3B
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
East Hartford, CT 06108

Water Pollution Control Facility SBR Air Diffuser Upgrades Phase 2
Renovation
Results
$1,300,000 est. value
Montville, CT

Quinebaug Valley Hatchery Energy and Water Supply System Operating Improvements
Renovation
Results
$2,979,587 to $3,293,228 est. value
Plainfield, CT 06374

Water Pollution Control Facility Service Building Replacement
Demolition, New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Waterbury, CT 06708

Killingly WPCA Building Improvement Project
Renovation
Pending Verification
$200,000 CJ est. value
Killingly, CT 06239

Cedarwood Valley Siphon Construction - Water Pollution Control Facility - City of Meriden
New Construction, Infrastructure
Conception
$250,000 CJ est. value
Meriden, CT 06451

Upgrades to the Water Pollution Control Facility
Renovation
Bidding
$750,000 CJ est. value
Norwich, CT 06360

RFP - Solar Project Consultation and Implementation Services
Term Contract
Post-Bid
Litchfield, CT 06759

Sludge Degritting System Improvements
Renovation
Results
$9,165,000 CJ est. value
Stamford, CT 06902

Roofs on Water Pollution Control Facility Buildings - City of Meriden
Renovation
Conception
$250,000 CJ est. value
Meriden, CT 06451

Last Updated 04/05/2023 04:33 AM
Project Title

West Lake and Margerie Water Treatment Plants - Facilities Upgrades - City of Danbury

Physical Address View project details and contacts
City, State (County) Danbury, CT 06810   (Fairfield County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $25,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

West Lake and Margerie Water Treatment Plants - Facilities Upgrades As April 05, 2023, this project is currently in the FY 22/23 - FY 27/28 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024-2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents