Similar Projects
Last Updated | 10/05/2021 11:36 AM |
Project Title | Town of Red Hook Well No. 1 and Well No. 2 Rehabilitation and Level Sensor Installation |
Physical Address | View project details and contacts |
City, State (County) | Red Hook, NY (Dutchess County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of rehabilitation of the Town Water District No. 1's existing two wells and installation of a level sensor terminating at a junction box at the top of the well heads. a) Well No. 1: 1. Pull existing well pump. 2. Perform a pre-cleaning television inspection of the well in accordance with Section 02529. 3. Perform a pre-cleaning 2-hour pump test in accordance with Section 02528. 4. Rehabilitate the well in accordance with Section 02528. 5. Perform a 30-minute pump test after each set of applications in accordance with Section 02528. 6. Perform a post-cleaning television inspection of the well in accordance with Section 02529. 7. Re-install existing well pump. 8. Install well level transducer, junction box, and aneroid bellows in accordance with Section 13420 and as shown in the attached Drawing. 9. Disinfect each well in accordance with Section 02528. 10. Properly neutralize and treat discharge water from the wells during rehabilitation in accordance with Section 02528. b) Repeat steps above for Well No. 2 |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |