Similar Projects
Water Plant Pump Replacement
Infrastructure
Bidding
Sharon Springs, NY 13459

Purchase of Submersible Leachate Pump, Breakout Box and Master Control Panel - EPG or Equal
Alteration
Bidding
Lindenhurst, NY

Pumps-Furnish and Deliver Submersible Non-Clog Pumps Cornell 6NHTA
Term Contract
Post-Bid
Pomona, NY 10970

Pump Seals
Post-Bid
Yonkers, NY 10701

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Water District 12 Wellfield Improvements Project
Post-Bid
Monroe, NY 10950

Furnish Submersible Pumps as Specified
Term Contract
Results
Syracuse, NY 13202

Submersible Pumps
Post-Bid
White Plains, NY 10601

Last Updated 10/05/2021 11:36 AM
Project Title

Town of Red Hook Well No. 1 and Well No. 2 Rehabilitation and Level Sensor Installation

Physical Address View project details and contacts
City, State (County) Red Hook, NY   (Dutchess County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of rehabilitation of the Town Water District No. 1's existing two wells and installation of a level sensor terminating at a junction box at the top of the well heads. a) Well No. 1: 1. Pull existing well pump. 2. Perform a pre-cleaning television inspection of the well in accordance with Section 02529. 3. Perform a pre-cleaning 2-hour pump test in accordance with Section 02528. 4. Rehabilitate the well in accordance with Section 02528. 5. Perform a 30-minute pump test after each set of applications in accordance with Section 02528. 6. Perform a post-cleaning television inspection of the well in accordance with Section 02529. 7. Re-install existing well pump. 8. Install well level transducer, junction box, and aneroid bellows in accordance with Section 13420 and as shown in the attached Drawing. 9. Disinfect each well in accordance with Section 02528. 10. Properly neutralize and treat discharge water from the wells during rehabilitation in accordance with Section 02528. b) Repeat steps above for Well No. 2

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans