Similar Projects
2021 Sanitary Sewer Repair Project
Bidding
Laureldale, PA 19605

Sanitary Sewer Improvements Project
Bidding
Bally, PA 19503

Franklin and Church Street Sanitary Sewer Rehabilitation Project
Post-Bid
Hamburg, PA 19526

2019 Road Improvement Project
Results
$156,000 est. value
Leesport, PA 19533

2019 Sanitary Sewer Replacements
Results
Mohnton, PA 19540

Utilities Installation and Replacement, Roadway and Drainage Improvements
Bidding
Less than $3,000,000 est. value
Mohnton, PA 19540

Sanitary Sewer Collection System
Results
Mohnton, PA 19540

2019-2020 Sanitary Sewer Joint Interceptor Manhole Replacement
Results
Kenhorst, PA 19607

Stormwater Control Measures
Results

2020 Road Improvement Project
Results
Reading, PA 19533

Sanitary Sewer Improvements Project
Results
Bally, PA 19503

2020 Stormwater Materials Project
Term Contract
Results
$50,000 est. value
Douglassville, PA 19518

Water and Sewage Maintenance at Blue Marsh Lake for base year plus 4 option year periods
Results
Leesport, PA

Broad Street Sanitary Sewer Improvements
Results
$1,587,353 est. value
Sinking Spring, PA 19608

2020 Street and Storm Sewer Improvements Project
Results
Kutztown, PA 19530

Last Updated 02/13/2020 09:14 AM
Project Title

Brecon Lane Storm and Sanitary Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Mohnton, PA 19540   (Berks County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material, labor, equipment and appurtenances for removal and replacement of approximately 175’ of existing 18" CMP and 36" CMP storm sewer and related appurtenances with 42” HDPE pipe, including three (3) inlets; and replacement of approximately 165’ of 8" VTC sanitary sewer with 8" SDR-35 removal and replacement of 6" PVC-SDR-35, including two (2) manholes. The project will also include street and lawn area restoration, E&S control installation, bypass pumping and other incidental construction. The project is located on Brecon Lane near the intersection with Castleton Drive.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents