Project Title | Washougal Oaks Demolition - Carrol and Wright Houses |
Physical Address | View project details and contacts |
City, State (County) | Washougal, WA 98671 (Clark County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $97,853 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project will take place on Washougal Oaks Natural Area in southeast Clark County, which is managed by the Washington Department of Natural Resources (DNR). The project includes the demolition and removal of two houses and a barn on two separate parcels. The purpose of the demolition is to return the area to its natural condition. Soil disturbance will be kept to a minimum. Heavy equipment should be thoroughly cleaned prior to work to prevent the introduction of weed seeds. An asbestos survey was completed on January 2nd, 2020 and October 20th, 2020. Asbestos was determined to be present in both houses but not the barn. All asbestos must be abated prior to removal of the structure. The estimated cost of the project is $97,853, and the required substantial completion date is December 31, 2022. The project is located at two different sites: 40224 Evergreen Highway (HWY 14) (accessed from a gravel road off HWY 14) and 39217 Se 70th Street (accessed from 382nd street and Gibson road), Washougal, WA 98671. For this project, bids will ONLY be received and accepted via the online electronic bid service through QuestCDN.com Prevailing Wage Requirement: YES Date of Final (Physical) Completion: Within 14 calendar days following the Date of Substantial Completion. LIQUIDATED DAMAGES Project Completion: For each calendar day after the time of completion that the work remains uncompleted, the Owner shall retain the sum of TWO HUNDRED AND EIGHTY DOLLARS ($280) per day as fixed, liquidated damages for the purpose of recovering additional DNR administrative and compliance costs, but not as a penalty. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |