Similar Projects
City Island Sanitary Sewer Repair
Infrastructure
Bidding
$100,000 est. value
FL

Indian Harbor Estates Sewer Retrofit
Infrastructure
Bidding
Oak Hill, FL

Potable Water Main Replacement Project
Infrastructure
Post-Bid
Orange City, FL

Sanitary Sewer Repair
Infrastructure
Post-Bid
Ormond Beach, FL

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

Installation of Manhole to Manhole 15" Sewer Line Liner System
Infrastructure
Bidding
Daytona Beach, FL 32118

Tatum Boulevard to Elizabeth Street Water Main
Results
Less than $400,000 est. value
Edgewater, FL 32132

Sanitary Sewer Rehabilitation
Infrastructure
Bidding
Edgewater, FL

Annual Contract Fire Hydrant Testing, Inspection and Refurbishment
Term Contract
Results
New Smyrna Beach, FL

North Campus Water Main Loop
Infrastructure
Bidding
Daytona Beach, FL

Lift Station #9 Replacement
Results
Less than $320,908 est. value
Holly Hill, FL 32117

Staggerbush Manhole Replacement
Results
Less than $120,000 est. value
New Smyrna Beach, FL

Zinnia Drive and Florida Drive Sewer Improvements
Results
Less than $258,915 est. value
Deltona, FL

Saxon Ridge Reclaimed Water Main Extension
Results
Less than $979,109 est. value
Deltona, FL 32725

Last Updated 07/13/2021 10:35 AM
Project Title

Barracuda Bridge Utility Replacement

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Potable water improvements installation of a new 10-inch pvc water main along quay assisi, 8- inch and 6-inch pvc water main along via capri and via benevento, and 2-inch pvc water main along via amalfi, including multiple service connections and new hydrants; horizontal directional drilling of a 12-inch hdpe water main across berry’s canal; horizontal directional drilling of two 6-inch hdpe electrical conduits across berry’s canal; horizontal directional drilling of new 14-inch hdpe potable water main across conner’s canal; horizontal directional drilling of two 6- inch hdpe electrical conduits across conner’s canal; and potable water service connections along the north causeway. B. Wastewater Improvements Installation Of New 4-Inch Pvc Force Main Along Quay Assisi; Horizontal Directional Drilling Of a 16-Inch Force Main Across Berry’s Canal, New Lift Station #9 Improvements Including New 6-Foot Diameter Wet Well, Valve Vault, New Submersible Wastewater Pumps, Discharge Piping And Appurtenances, Control Panel, And Various Site Improvements Including Fencing, Concrete Driveway, And Landscaping, And Other Work Displayed Or Described In The Contract Documents. C. Reclaimed Water Improvements Installation Of a New a 14-Inch Hdpe Reclaimed Water Line Under Conner’s Canal Along The North Causeway By Horizontal Directional Drill.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents