Similar Projects
Construction Manager as Constructor for Shawnee Med-Act Station
New Construction
Results
Olathe, KS

Psychiatric Hospital Renovations
Renovation
Pending Verification
Leavenworth, KS

KDADS B2 Building
Renovation
Results
$500,000 est. value
Osawatomie, KS 66064

John Parolo Education Center
Addition - 16,000 SF
Pending Verification
Pittsburg, KS

Y1da--Construct Endoscopy Suite (Minor) Construction
New Construction - 15,000 SF
Post-Bid
$10,000,000 to $20,000,000 est. value
Wichita, KS 67218

Overland Park Surgery Center
New Construction - 19,760 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Overland Park, KS 66214

Correct SPS Design Issues New
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Topeka, KS 66622

Reported 11/23/2021 12:00 AM
Project Title

EHRM Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) Wichita, KS 67218   (Sedgwick County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to datacenter for WAN, hazardous material abatement. The construction contractor shall provide all professional construction services for the project to renovate the existing IT closets in the follow building locations include: Buildings 1A, 1, 2, 3, 4, 5, 5B, 6, 7, 11, 12, 13, 16, 19, 20, 21, 26, 29, 34, 58, 59, 60, 61, 62 and site. Construction shall include the abatement of any hazardous materials as identified on the provided drawings. Construction contractor shall be responsible for third party air monitoring services to be provided during remediation of hazardous materials (i.e. asbestos, lead, mold, etc). Remediation shall be performed by the construction contractor. The construction of this project will take place in a very busy occupied building and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction necessitating carefully phased construction and coordination with VA COR/users.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Art, Window Treatments, Window Blinds, Casework, Furnishings and Accessories, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents