Project Title | OTECH Welding Additional Construction Services |
Physical Address | View project details and contacts |
City, State (County) | Kissimmee, FL 34744 (Osceola County) |
Category(s) | Education |
Sub-Category(s) | College/University, Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The installation of an additional interior steel structure. Installation of the steel structure should minimize impacts to partially completed interior works. Where necessary, rework of existing interior walls and conduit must be performed by the contractor. o provide new CNC Lab and Classroom as shown on the attached drawings as future work. Vendor is to complete fit out of additional planned Lab and Classroom by providing walls, electrical, and FF&E as required, including new stud walls, doors, interior windows, compressed air piping and hose reels, HVAC VAV box and exhaust fan and associated ductwork, electrical outlets and circuits for the CNC Classroom and Lab equipment. to provide and install exterior chain link fencing around the site and electrical equipment. In addition to the exterior fencing, Contractor is to supply (9) asphalt parking spaces, handicap signage, D type curbs and a sidewalk around the west side of the building. Also provide an asphalt drive, concrete slab, aluminum canopy and overhead door on the south side of the building. Completion of interior walls and electrical fit out is already contracted by existing construction manager and dependent on completion of added interior structural steel. Work done for this scope must be coordinated simultaneously alongside existing construction manager for avoiding rework, redundancy, and delays. Welding equipment including an exhaust extraction system is to be supplied and installed by the manufacturer and consideration and coordination for this scope must be provided. |
||||||||||||||||||||||||||||||||||||||
Details | College/University, New Construction, Middle/Senior High School, New Construction.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |