Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

Garrett TEC Renovation
Renovation
Conception
$4,876,000 est. value
Houston, TX

Gibbs Ranch Equestrian Facility & Agriculture Labs Phase 2 Construction
New Construction
Design
$5,000,000 est. value
Houston, TX

McNair Vocational Remodel
Renovation
Bidding
Baytown, TX

Student Housing Public Private Partnership P3
New Construction
Bidding
Houston, TX 77004

University of Houston College of Medicine
New Construction - 133,800 SF
Post-Bid
Less than $72,500,000 est. value
Houston, TX

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

UH Hilton College Renovation and Expansion
Renovation
Results
$30,400,000 est. value
Houston, TX

CMAR for New Visual and Performing Arts Building at Lone Star College University Park Campus
New Construction
Results
Houston, TX 77070

Graduate College of Social Work Renovation
Renovation, Addition - 5,000 SF
Construction
$2,300,000 est. value
Houston, TX

Renovate Smith Research Building Construction Manager at Risk
Renovation
Construction
Houston, TX 77054

BCM Education Space
Renovation
Pending Verification
Houston, TX 77030

Rice University Sarofim Hall
New Construction - 50,000 SF
Conception
$25,000,000 est. value
Houston, TX 77005

Capital Renewal Central Campus Marcom Building
Renovation
Bidding
$7,400,000 est. value
Pasadena, TX

Kingwood Campus - Health Professions Center
New Construction - 49,000 SF
Post-Bid
Kingwood, TX 77339

Reported 04/01/2022 07:51 AM
Project Title

Capital Renewal Central Campus Marcom Building

Physical Address View project details and contacts
City, State (County) Pasadena, TX 77505   (Harris County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $7,400,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes Demolition of the majority of interior improvements. Build back with all new Mechanical, Electrical, and Plumbing components. Probable addition of glazing to the building envelope. Additional details are not available at this time as the CMAR is expected to participate in design assist

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents