Similar Projects
Last Updated | 04/06/2023 08:38 AM |
Project Title | DRGWQTC WWPS and WWSB Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY 40272 (Jefferson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $6,370,862 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Derek R. Guthrie Water Quality Treatment Center (DRGWQTC) WWPS and WWSB Rehabilitation The principal features of the work to be performed under this contract include, but are not limited to the following: 1. Demolition of existing Boiler system 2. Selective Demolition of existing AHUs, fans, and ducts 3. Installation of new ducts, fans, and grilles 4. Installation of split air units 5. Installation of indirect fire gas heater 6. Elimination of U3/U4 Transformers 7. Installation of new MCC 8. New Power Feed to WWPS and WWSB 9. Electrical modifications for HVAC 10. Installation of Gas Detection system 11. Repair of existing pipe penetrations 12. Roof replacements 13. Gas line installation 14. Mold abatement and painting 15. Replace exterior wall panel caulk and window repair. All work shall be done in accordance to MSD's Standard Specifications. The Engineer's Construction Cost Estimate for this project is between $ 3,182,000.00 and $ 4,304,000.00 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project Manager for this Invitation to Bid is Darryl Evans. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Darryl Evans at darryl.evans@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) - FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below: If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate "GOOD FAITH EFFORTS" in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Darryl Evans. 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. Each bidder must accompany his Proposal with the Bid Bond executed on a form identical to the form annexed hereto, or a certified check made payable to MSD for an amount not less than seven and one-half percent (7.5%) of the Total Bid. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |