Similar Projects
2021/2022 Utility And Street Reconstruction
Renovation
Bidding
WI

Concrete Paving III (South 30th Street Reconstruction)
Bidding
Manitowoc, WI 54220

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

North 8th Street and Maritime Drive Intersection Improvements
Bidding
Manitowoc, WI 54220

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Asphaltic Concrete Paving
Post-Bid
Manitowoc, WI 54220

Milwaukee - Green Bay Road, Scl - Wilson / Lima Road
Results
WI

Calumet Drive Pavement Repair
Post-Bid
Sheboygan, WI 53083

Last Updated 11/24/2020 07:17 PM
Project Title

Elkhart Lake - Kiel, South County Line - STH 32/57; Plymouth - Kiel, Suhrke Road - North County Line

Physical Address View project details and contacts
City, State (County) Elkhart Lake, Kiel, WI 53042 (Manitowoc, Sheboygan Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 14,090 CY; Borrow, 21,766 CY; Backfill Structure, 651 Ton; Base Aggregate Dense, 23,877 Ton; Breaker Run, 56 Ton; Concrete Pavement, 12,113 SY; Concrete Masonry Culverts, 89 CY; Concrete Masonry Overlay, 23 CY; Bar Steel Reinforcement, 8,850 Lbs; Bar Steel Reinforcement Coated, 1,490 Lbs; Marking Epoxy, 202,482 LF; Construction Staking, 208,544 LF; Construction Staking, 42 Each; Construction Staking, 3 LS; Culvert Pipe Corrugated Steel, 16 LF 12“, 61 LF 24“, 183 LF 48“, 40 LF 15“, 2 LF 30“, 84 LF 18”, 12 LF 36”; Culvert Pipe Reinforced Concrete, 95 LF 18“, 144 LF 24“; Storm Sewer Pipe Reinforced Concrete, 56 LF 12“; Concrete Curb, 423 LF; Concrete Curb and Gutter, 7,247 LF; Concrete Sidewalk, 9,491 SF; Beam Guard, 1,583 LF; Beam Guard Energy Absorbing Terminals, 22 Each; Asphaltic Surface, 957 Ton; HMA Pavement, 43,228 Ton; Removing Asphaltic Surface Milling, 223,156 SY; Tack Coat, 20,049 Gals; Signs, 2,341 SF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents