Similar Projects
Evidence Incinerator System
Renovation
Bidding
Colorado Springs, CO 80906

Job-Order Contract Services (JOCs) for General Construction Projects.
New Construction
Bidding
Englewood, CO

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

CMGC Chemical Phosphorus & UV Disinfection Project
Results
Englewood, CO 80110

Headworks and Odor Control Project
Results
Less than $6,000,000 est. value
Superior, CO 80027

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Avon WWTF Lab Improvements
New Construction
Bidding
Vail, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

2020 Trenchless Sewer Main Replacement
Results
Less than $1,164,404 est. value
Arvada, CO 80002

Lazy Glen Wastewater Treatment Facility
Renovation
Bidding
CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

Non-Potable Water Reuse System
Results
Pueblo, CO 81007

Sludge Drying Facility
New Construction
Bidding
New Castle, CO

Rifle Wastewater Reclamation Facility Dewatering Improvements
Post-Bid
Less than $744,000 est. value
Rifle, CO

Last Updated 10/12/2021 07:16 AM
Project Title

Santa Rita Water Reclamation Facility (SRWRF) Treatment Complex Basement Leak Mitigation

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To rehabilitate the concrete walls shared between the Treatment Complex Basement and the adjacent secondary clarifiers, thereby mitigating leaks into the Treatment Complex Basement 1. Remove all deteriorated concrete to expose a sound substrate and expose cracks. 2. Drill injection holes adjacent to cracks and inject hydroactive polyurethane grout per manufacturer's instructions. Multiple injection operations may be needed to fully seal cracks. 3. Place polymer modified grout for resurfacing and patching per manufacturer's instructions. 4. Water-test the secondary clarifiers to show mitigation of leaking as necessary. 5. Remove injection ports from concrete surface. 6. Restore wall surface to match existing non-deteriorated surfaces.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Clarifier Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents