Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Saint Augustine, FL 32084

Dredged Material Management Area SJ-14 Weir Replacement
Infrastructure
Bidding
FL

St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14, St. Johns County, Florida
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Design-Build Services for Hurricane Matthew FEMA Cat. B Emergency Berm Restoration
Results
Less than $11,584,996 est. value
FL

Marsh Flow-Way C1 and C2 Maintenance Improvements
Results
Less than $1,760,000 est. value
FL

Side Drain Replacement
Results
Less than $250,000 est. value
FL

Kings Estate Road Drainage Improvements - HMGP 4283-44-A
Results
Less than $337,216 est. value
FL

Fellsmere Grade CS2 Sliplining
Results
Less than $175,000 est. value
FL

South Orange Street Drainage Improvements
Results
Less than $530,000 est. value
FL

Minor Water Control Structure Rehab
Results
Less than $300,000 est. value
FL

Maintenance Services for Elkton Canal
Results
Elkton, FL 32033

Last Updated 12/09/2021 09:12 AM
Project Title

CDBG-Dr Project - Armstrong Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Armstrong, FL 32033   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $884,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to improve four cross drains by replacing/consolidating existing cross drains and to construct one new cross drain beneath Armstrong Road. Additional work includes one culvert improvement at the trailhead of the non-motorized trail, roadside and lateral ditch regrading, and driveway culvert replacement. Work also includes erosion control measures, pavement cuts/repairs, maintenance of traffic, and utility adjustments.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents