Similar Projects
Z--Slbe - Empire Water Renovations
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Empire, MI

Water Pipe Maintenance Replacement (Medical Center) Bidpack 01- Construction
Infrastructure
Bidding
Ann Arbor, MI

Royal Oak Township Lead Service Line Replacement
Alteration
Bidding
Ferndale, MI

Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

Multiple Blocks - Student Publications - Replace Water Service to Building Jenny Lessard
Post-Bid
Ann Arbor, MI 48109

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

Valve Replacement Project
Alteration
Bidding
Wyoming, MI

T4: Infrastructure
Post-Bid
Highland, MI

Z1da--Correct Water Distribution Deficiencies Legionella 515-18-107
Results
$2,000,000 to $5,000,000 est. value
Battle Creek, MI 49037

Williams St. at RxR Crossing Water Main Improvements
Alteration
Bidding
$111,930 est. value
Bellevue, MI

Replacement of Steam Manhole 81
Post-Bid
Lansing, MI 48937

M-21 (Lincoln Ave) Water Main, M-66 (State Street) to Baldie Street
Results
Ionia, MI 48846

Lower Rough CSO Design Area 2-42
Infrastructure
Bidding
Dearborn Heights, MI

Lakewood Wastewater Authority - Phase II Collection Improvements - Gravity Interceptor Sewer And Force Main
Post-Bid
Lake, MI

Reported 02/09/2022 12:00 AM
Project Title

Water System Improvements Contract 1 - Distribution System

Physical Address View project details and contacts
City, State (County) Kaleva, MI   (Manistee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the construction of approximately 7,000’ of watermain installed via direct bury and approximately 2,700’ of watermain via directional drilling, along with associated water services. Open cutting, pipe tie-ins, and associated site restoration will be executed throughout construction. Necessary control measures and dewatering will also be implemented. Road reconstruction includes removals and placement of HMA paving, subbase materials, concrete curb & gutter, sidewalk, and driveways. Prevailing wage requirements apply to the entire contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents