Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

Wastewater Treatment Plant Effluent Pumping Station
New Construction
Bidding
$20,000,000 est. value
East Orange, NJ

Waterwitch Wastewater Pump Station
Renovation
Bidding
$500,000 est. value
Highlands, NJ 07732

Garden Street Pump Station Upgrade
Renovation
Post-Bid
$1,500,000 est. value
Mount Holly, NJ 08060

Furnishing, Maintenance, Service and Repair of Ocean City Sewer Lift Station and Storm Water Pump Stations
Post-Bid
Ocean City, NJ

Rehabilitation of Lower Preakness Pump Station
Results
Wayne, NJ 07470

Pump Station No. 12 Infrastructure Upgrade
Results
$800,000 est. value
Little Silver, NJ 07739

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Construction
Long Branch, NJ 07740

Middlebrook Pump Station Upgrades Phase I
Renovation
Bidding
$580,000 est. value
NJ

Wallington Pumping Station Rehabilitation Project
Renovation
Post-Bid
Wallington, NJ

Allison Drive Pump Station Replacement
Results
Cherry Hill, NJ 08002

Harrison Avenue Pump Station Improvements
Renovation
Construction
Kearny, NJ 07099

Patcong Avenue Sewage Pump Station Rehabilitation
Renovation
Bidding
$500,000 est. value
Linwood, NJ 08221

Purchase and Installation of one (1) In-Channel Grinder for the North Ridge Pump Station
Alteration
Post-Bid
Princeton, NJ

Last Updated 05/19/2022 02:56 PM
Project Title

Pump Station Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Cape May Court House, NJ   (Cape May County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work will include furnishing of all labor, materials and equipment necessary to complete rehabilitation to the Township’s existing 11th Street Pump Station, 15th Street Pump Station, Oak Avenue Pump Station, and Avalon Manor Pump Station (total of 4 separate facilities, each to be improved), as shown on the Drawings and as described in the Specifications. The work for the aforementioned pump stations will require demolition, including but not limited to, implementation of bypass pumping operations, excavation, removal and off-site disposal of existing discharge piping, valves and appurtenances, pumps, partial demolition of existing concrete slabs, limited removal of existing force main and demolition of electrical equipment noted on the Contract Drawings. Following completion of demolition, the work will also include construction of new pump station valve/meter chamber, installation of new wet well riser sections and top slabs, installation of new epoxy coating system within wet well, installation of new submersible sewage pump and associated discharge piping and appurtenances, process piping, valves, magnetic flow meters and fittings, miscellaneous metals and platforms, construction of new electrical work including power distribution, controls and standby generator systems, site work including site and access clearing, and driveway construction, landscaping, new site security fencing, and site restoration, all as shown on the drawings and specified herein. The work shall be completed within 365-calendar days of the Contractor's receipt of written Notice to Proceed.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents