Similar Projects
Barracuda Bridge Utility Replacement
Post-Bid
$2,500,000 est. value
New Smyrna Beach, FL

Reclaimed Water Main Extension Phase 4
Results
Less than $1,920,000 est. value
De Land, FL 32720

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

Tatum Boulevard to Elizabeth Street Water Main
Results
Less than $400,000 est. value
Edgewater, FL 32132

Annual Contract Fire Hydrant Testing, Inspection and Refurbishment
Term Contract
Results
New Smyrna Beach, FL

Lift Station #9 Replacement
Results
Less than $320,908 est. value
Holly Hill, FL 32117

Saxon Ridge Reclaimed Water Main Extension
Results
Less than $979,109 est. value
Deltona, FL 32725

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Potable Water and Fire Protection System Backflow Device Testing, Certifications and Repairs for the City of Deland FY 19/20
Term Contract
Results
De Land, FL

Thornby Park Water Quality Improvements Project
Results
Less than $367,000 est. value
FL

Construction Management/General Contracting Services for Deleon Springs Utility Extensions
Results
Less than $4,000,000 est. value
De Land, FL 32720

N. US 1 Water Main/Force Main Extension
Results
Less than $3,430,050 est. value
Ormond Beach, FL 32175

Sugar Mill Drive 20-Inch Reclaimed Main Relocation
Results
New Smyrna Beach, FL 32168

Construction Management at Risk for Underground Utility Services
Results
Ormond Beach, FL 32175

FY 2020 Water Main Improvements
Results
Less than $1,500,000 est. value
De Land, FL

Last Updated 06/10/2021 01:57 PM
Project Title

Monastery Road Reclaimed Water Extension

Physical Address View project details and contacts
City, State (County) Orange City, FL 32763   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Project consists of the construction of approximately 2100-ft of new 10” Reclaimed Water Main (RWM) which includes approximately 1975-ft directional drill construction, 240-ft of 6”-8” RWM along Monastery Rd. from N. Silverstone Ct. to approximately 200-ft south of Veterans Memorial Pkwy, ending in the Oakhurst subdivision (Waterside Oaks Dr.). B. Furnish all materials, equipment, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. C. Reference Section 01410 - Regulatory Requirements and Permits concerning permits secured by the Owner and permits to be secured by the Contractor. Other licenses or permits for construction facilities of a temporary nature that are necessary for the prosecution of the work shall be secured and paid for by the Contractor. D. Repair, replace, or otherwise settle with the Owner, if damage to property or existing facilities occurs, including damage to pavements, utilities, lawns, structures, etc. E. Construct the Project under a single unit price contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents