Similar Projects
Transfer Station Composting Facility
Results
Less than $912,808 est. value
Los Lunas, NM 87031

Large Scale Roadway and Site Improvements
Post-Bid
Los Lunas, NM 87031

Canon Community Ditch Association - Priority Acequia Improvements
New Construction
Construction
NM

UNM Construction Manager At Risk - UNM Valencia Campus Work Force Training Center
Results
Less than $5,435,505 est. value
Albuquerque, NM

3657 DACC Workforce Center Parking Lot and Site Improvements
Results
Las Cruces, NM 88003

Westgate Community Center
Construction
Albuquerque, NM

Hobbs Municipal Schools Career & Technology Education Center
Post-Bid
Hobbs, NM 88240

Communications Site Construction Upgrade
Term Contract
Post-Bid
Santa Fe, NM 87505

Hydro Excavation
Term Contract
Results
$56,175 est. value
Farmington, NM

San Pedro Mine Safeguard Project - Phase III
Results
Santa Fe, NM 87505

Primrose School of Northwest Albuquerque
New Construction
Design
Albuquerque, NM 87120

Canon Community Ditch Association - Phase II Acequia Improvements Project
New Construction
Results
$250,000 est. value
Canones, NM

Underground Concrete Utility Vaults
Bidding
Farmington, NM

Reported 12/20/2019 12:00 AM
Project Title

Jacob Hands Waste Water Treatment Facility Site Improvements Project

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88001   (Dona Ana County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following improvements Grading and developing the site at the north side of the Jacob A. Hands Wastewater Treatment Facility around the newly constructed two metal buildings and the Co-generators. The development shall include: 1.Demolition of existing concrete solids dry dock structure 2.Earthwork (include Tree Removal if necessary, clearing and grubbing, stripping, and grading) 3.Installation of new 6-ft. high Chain-link fence including the removal of the portions that are shown the approved plans 4.Installation of three of 5-ft. wide each pedestrian gate 5.Installation of 30-feet wide Automatic Cantilever slide chain-link gate including all necessary conduits, cabling, fixtures, structures, opening controls, remote opening control, and the power connection to the City provided electric power source. 6.Installation of 30-feet wide Manual Cantilever slide chain-link gate 7.Asphalt Pavement of the parking lot around the metal buildings (including marking) 8.Construction of new concrete drying dock 9.Construction of three retention Ponds with slopes and stabilization of 4-inch mortared bed rock or stacked rock as identified in the approved plans 10.Placing 3-inch minimum depth of ¾ inch landscape crushed rock gravel

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents