Similar Projects
RFQ Design - Architectural Services - Harrison Middle School
Demolition, New Construction, Infrastructure
Conception
$22,747,500 CJ est. value
Albuquerque, NM 87105

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Conception
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Full Service Design IDIQ
New Construction
Design

Statewide Drainage Engineering On-Call Services
Term Contract
Bidding
Albuquerque, NM

Barr Spur Improvements Project
Infrastructure
Bidding
$3,700,000 CJ est. value
Albuquerque, NM 87105

General Aviation Area Fence Improvements
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Albuquerque, NM 87102

Architect-Engineer (A-E) General Services Supporting Civil Works Programs In Support of the US Army Corps of Engineers Fort Worth District and Southwestern Division
Post-Bid
$250,000 to $105,000,000 est. value

Architect-Engineer (A-E) Construction Phase Services (CPS) for Southwestern Division (SWD) and Fort Worth District (SWF) Military and Civil Works Multiple Award Task Order Contract (MATOC)
Post-Bid
$250,000 to $175,000,000 est. value
Fort Worth, TX

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Hiland Plaza
New Construction, Infrastructure - 80,000 SF
Construction
$18,000,000 CJ est. value
Albuquerque, NM 87108

Prince Street Industrial Speculation Building
New Construction, Infrastructure - 84,000 SF
Construction
$45,000,000 CJ est. value
Albuquerque, NM 87105

RFP Engineering - Southside Water Reclamation Plant (Swrp) Outfall Restoration Project Design
Infrastructure
Pending Verification
$4,994,567 CJ est. value
Albuquerque, NM 87105

Bernalillo County Public Safety Training Academy
New Construction, Infrastructure - 40,981 SF
Pending Verification
$15,000,000 CJ est. value
Albuquerque, NM 87102

Last Updated 08/12/2022 05:25 AM
Project Title

RFP Engineering - Hubbell Lake Dam Expansion Project

Physical Address View project details and contacts
City, State (County) Albuquerque, NM 87121   (Bernalillo County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Dam/Tunnel, Engineering, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Chief Procurement Officer (CPO) of the Albuquerque Metropolitan Arroyo Flood Control Authority (AMAFCA) seeks competitive sealed proposals for Professional Services for the project - Hubbell Lake Dam Expansion Project The Procurement Code, N.M.S.A. 1978 13 1 28 through 13 1 199, imposes civil and criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for illegal bribes, gratuities, and kickbacks. The method of Contractor Selection has not been Determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents