Similar Projects
Riverwood Avenue Shop Condos
New Construction - 12,025 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Mandan, ND 58554

Hamilton Housing Development
New Construction
Conception
Bismarck, ND 58503

Red River Welders Supply
New Construction - 6,000 SF
Design
Grand Forks, ND 58203

Phase MI-5B.2 Equipment Storage Building Improvements
Renovation
Bidding
$440,000 est. value
Minot, ND

West Fargo Parks Maintenance Facility
New Construction - 25,732 SF
Post-Bid
$2,500,000 est. value
West Fargo, ND 58078

Bus Barn / Weight Room
New Construction - 4,000 SF
Post-Bid
Powers Lake, ND

New Town School Housing
New Construction
Results
$1,000,000 to $5,000,000 est. value
New Town, ND

Minot Landfill Recycling Transfer Station
New Construction, Infrastructure
Results
Minot, ND

Mail Truck Storage Facility
New Construction
Construction
Minot, ND

Industrial Park
New Construction - 1,929,000 SF
Pending Verification
$53,300,000 est. value
Fargo, ND

Grand Sky Development Equipment Storage Building
New Construction
Post-Bid
Grand Forks, ND

Sand Storage Shed
New Construction
Results
Grand Forks, ND

Office and Apparatus Bay
Addition
Post-Bid
Alexander, ND 58831

Mouse River Enhanced Flood Protection Phase MI-5B.1 - Equipment Storage Building Relocation
Renovation
Results
Minot, ND

Trollwood Storage Building
New Construction
Post-Bid
Fargo, ND 58102

Reported 06/25/2022 12:00 AM
Project Title

Warehouse Stock Perma Pipe

Physical Address View project details and contacts
City, State (County) Grand Forks, ND   (Grand Forks County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents