Similar Projects
Zeigler Royalton Athletic Facility
New Construction, Infrastructure
Bidding
$900,000 CJ est. value
Mulkeytown, IL 62865

Reseal
Infrastructure
Post-Bid
Christopher, IL

Reseal
Infrastructure
Post-Bid
Benton, IL

New Pavilions
New Construction
Results
Less than $200,000 est. value
West Frankfort, IL

9 Miles of Lane Addition, Median Barrier Installation and Resurfacing Existing Lanes of I-57 From Mile Post 66 to Marcum Branch
Infrastructure
Results
IL

Roadway Paving
Infrastructure
Post-Bid
Benton, IL

Road Improvements
Infrastructure
Results
West Frankfort, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Construction of Water System Improvements - Phase II
Infrastructure
Post-Bid
$300,000 CJ est. value
Sesser, IL 62884

Conversion of the Wye Intersection of Il 149 and Il 184 to a Roundabout Intersection.
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

5.4 Miles of Patching, Hma Surface Removal and Resurfacing, Safety Shoulders
Infrastructure
Results
IL

Asphalt Seal Coat
Infrastructure
Post-Bid
$300,000 est. value
West Frankfort, IL

Central JHS Parking Lot Replacement
Renovation, Infrastructure
Results
West Frankfort, IL 62896

Last Updated 11/18/2022 12:09 PM
Project Title

Wayne Fitzgerrell - Replace Culverts and Pave Bike Trail Section

Physical Address View project details and contacts
City, State (County) Whittington, IL 62897   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

IDNR is seeking a Vendor to replace and pave a bike trail section at Wayne Fitzgerrell SRA. BEP Goal: 28% Is this a Small Business Set Aside Procurement: No Is there a BEP/VBP Participation Goal : Yes If yes, BEP Goal Percentage: 28.00000 If yes, VBP Goal Percentage: 0.00000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents