Similar Projects
Rugby and Sunny view Plat Improvements
Infrastructure
Post-Bid
$265,355 est. value
OH

Jacking and Boring Services
Infrastructure
Post-Bid

Reventment Bags and Erosion Control Mats
Results

Bellefontaine Road Widening and Culvert Replacement
Results
Less than $900,000 est. value
Huber Heights, OH

Box Culverts
Infrastructure
Post-Bid

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Concrete Pipes
Infrastructure
Post-Bid

Philadelphia Drive and Markey Road Culvert Rehabilitation Project
Results
Less than $950,000 est. value
Dayton, OH

Erosion Control - Site 14
Infrastructure
Post-Bid
$380,000 est. value
OH

Culvert Replacement - MOT-US 35-07.21/08.01
Results
Trotwood, OH

Precast Catch Basins, Risers, and Grates
Infrastructure
Post-Bid

Meadowbrook Avenue Culvert Improvements
Results
$97,670 est. value
Dayton, OH 45415

Concrete Pipes
Infrastructure
Post-Bid

Removal and Replacement of Identified Curb and Catch Basins
Infrastructure
Results
$317,630 est. value
Trotwood, OH 45426

Wesleyan Metropark Hodapp and Gilliland Site Clean-up
Infrastructure
Post-Bid
$108,094 est. value
Dayton, OH 45406

Last Updated 07/01/2022 01:46 AM
Project Title

Fourth Street Sycamore Creek Mitigation

Physical Address View project details and contacts
City, State (County) Miamisburg, OH 45342   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $72,115 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Fourth Street Sycamore Creek Mitigation project will include excavation and grading, partial removal of a concrete retaining wall including saw cutting, removal of a block wall, removal and replacement of a chain link fence, construction of a section of embankment using on site clay material, furnishing and placement of topsoil, seeding, fertilizing, and mulching.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Finish Grading, Spreading and Grading Topsoil, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Fences and Gates, Retaining Walls, Turf and Grasses, Hydro-Mulching.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents