Similar Projects
Reported | 10/15/2021 10:33 AM |
Project Title | Site 114-E-W-4 New Elementary School Relief Project |
Physical Address | View project details and contacts |
City, State (County) | Winter Garden, FL 34787 (Orange County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | |
Project Status | Construction Commenced third quarter |
Bids Due | View project details and contacts |
Estimated Value | $27,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To construct a new relief school project known as Site 114-E-W-4 Elementary located off Bismarck Palm Drive in Winter Garden, Florida. This project consists of the reuse of a multi-story prototype elementary school on a new (approximately) 13.5 acre site to provide improved facilities, with an estimated construction budget of $21,000,000. Goal LDB:10% VBE:3% The Contract(s) shall be subject to the limitations and restrictions of Florida Statutes. Major elements of the project include: A. Construction of a new multi-story prototype school building, approximately 96,605 gross square feet, with the following spaces: classrooms, skills/resource labs, art, music, administration, kitchen, dining/multi-purpose room, media center, and support spaces. B. The new facility shall accommodate 837 student stations. C. General scope items within the site package include but aren’t limited to: new parking areas, parent loop, bus loop, play amenities, exterior walkways and canopies, underground utilities, storm water drainage system, landscaping, irrigation, fencing, and site lighting. D. Construction of new PE pavilion, PE Office, toilets, PE storage and outdoor PE amenities such as multi-purpose fields, hard courts and playgrounds. E. Offsite scope will include work in the Right of Way to add turn lanes into the site, flashing beacons and crosswalk(s). The general services outlined below will be performed: 1. Pre-Construction Phase Services shall include but are not limited to: attending any and all design and preconstruction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting “as-is” conditions (including offsite and onsite utilities from which connections are to be made). 2. Construction Phase Services include, but are not limited to, furnishing and paying for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents. The CM shall provide all necessary professional services to deliver to the owner a safe, finished, and fully functioning Elementary School Facility within the estimated construction budget. |
||||||||||||||||||||||||||||||||||||||||
Details | Elementary School, New Construction, 13.50 Acres, 1 Elementary School, Approximately 94,369 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |