Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

2021 Street Improvements
Post-Bid
Lincolnwood, IL

Sidewalk, Curb
Results
Hanover Park, IL

Revise Domestic Water System - Division 01
Post-Bid
Chicago, IL 60612

Last Updated 09/01/2022 05:06 PM
Project Title

2022 Street, Water Main and Sewer Improvements

Physical Address View project details and contacts
City, State (County) Schiller Park, IL 60176   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,054,453 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

President and Board of Trustees of the Village of Schiller Park, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 STREET, WATER MAIN AND SEWER IMPROVEMENTS The work shall take place on various streets within the corporate limits of Schiller Park, Illinois. The scope of work includes the installation of 8" ductile iron watermain, directionally bored 1" copper services with box, valves, fire hydrants and HMA patching of water trench. The work shall also include the installation of new 8" PVC Sewer, RDMH, Ty'C'CB and Inlets. In addition, the scope of work of the project involves the removal and replacement of partial curb and gutter, sidewalks, and driveway aprons, adjustments, reconstructions of drainage structures, replacement of drainage structures, milling the existing asphalt surface, pavement patching, installation of a hot-mix asphalt binder course, and hot-mix asphalt surface course, spot restoration of the parkways, and all other appurtenant work thereto. The location of the work shall be as follows: Eastwood Avenue West End to Old River Road Water Main, Services and Paving Scott Street Irving Park Road to just North of Sunnyside Avenue -Water Services Judd Avenue Wehrman Avenue to Montrose Avenue Water Main & Services Wehrman Avenue Judd Avenue to Montrose Avenue Water Services Montrose Avenue Wehrman Avenue to Scott Street Water Services Agatite Avenue West End to Scott Street Water Main & Services Sunnyside Avenue West End to Scott Street Water Main & Services Ivanhoe Court Ivanhoe Avenue to North Cul-de-Sac - Sewer & Paving No bidding documents will be issued after 4:00 P.M. on Thursday July 28, 2022. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Schiller Park for a period of sixty (60) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. The Village of Schiller Park reserves the right to determine the lowest, responsive and responsible bidder, to waive irregularities and to reject any or all bid proposals.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents