Similar Projects
Station 5 Above Ground Tank Installation
Renovation
Sub-Bidding
$175,000 CJ est. value
Chicopee, MA 01020

On-Call Building Systems Integration Administrator
Term Contract
Sub-Bidding
Lexington, MA 02420

4th Floor Entrance
Alteration
Post-Bid
$21,296 est. value
Fitchburg, MA 01420

Term Interior Building Repair
Term Contract
Post-Bid
Boston, MA

Bathroom Tubs
Results
Less than $140,009 est. value
Brewster, MA 02631

On-Call Tub Refinishing Repairs
Results
$20,000 est. value
Lowell, MA

Interior/Furniture Design
Term Contract
Post-Bid
Boston, MA

Ceiling Replacement Whittemore Library
Alteration
Results
$96,000 est. value
Framingham, MA

Wentworth Hall Panel Partitions
Alteration
Post-Bid
$28,000 est. value
Westwood, MA

Repaint & New Vinyl Stair Covers
Alteration
Results
$93,000 est. value
Framingham, MA 01702

Commuter Lot Stairway Reconstruction
Alteration
Post-Bid
$100,000 est. value
North Adams, MA 01247

Insulation and Sealing of Windsor Town Hall
Alteration
Results
$23,000 est. value
Windsor, MA

Partial Height GWB Wall and Millwork Project
Alteration
Post-Bid
$35,000 est. value
Roxbury, MA

Bid Package #2 Sitework and Concrete, Oliver Partnership School Renovation & Addition
Alteration
Results
$19,700,000 est. value
Lawrence, MA 01840

Kitchen Cabinet Replacement
Alteration
Post-Bid
$49,000 est. value
Southborough, MA 01772

Last Updated 05/31/2023 08:52 AM
Project Title

Crawl Space Ventilation At Sunset Hill

Physical Address View project details and contacts
City, State (County) Fall River, MA 02724   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $316,900 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of  March 13, 2023 this project has not yet been awarded. A timeline or award has not yet been established.**  Installation of new static louvered vent assemblies in the lower portion of the exterior walls/foundation walls for natural ventilation in crawl spaces of Apartment Building 17, Apartment Buildings 19 through 30 and Apartment Building 34. Provide a polyethylene-sheet vapor retarder, covering the earth floor in crawl spaces and attached 12-inches up the foundation wall of Apartment Building 17, Apartment Buildings 19 through 30 and Apartment Building 34. Contractor Qualification - DCAMM Certificate

Details

Renovation, Renovation.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents