Similar Projects
Last Updated | 06/12/2021 02:09 AM |
Project Title | Vertical Realignment on i-57 in the City of Marblehead |
Physical Address | View project details and contacts |
City, State (County) | IL (Adams County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 40600290 Pound Bituminous Materials (Tack Coat) Base Items 486.000 40600982 Sq Yd Hot-Mix Asphalt Surface Removal - Butt Joint Base Items 747.000 40603080 Ton Hot-Mix Asphalt Binder Course, Il-19.0, n50 Base Items 138.000 40604050 Ton Hot-Mix Asphalt Surface Course, Il-9.5, Mix "c", n50 Base Items 91.000 44000155 Sq Yd Hot-Mix Asphalt Surface Removal, 1 1/2" Base Items 88.000 48101202 Cu Yd Aggregate Shoulders, Type b Base Items 111.000 67100100 l Sum Mobilization Base Items 1.000 70102620 l Sum Traffic Control And Protection, Standard 701501 Base Items 1.000 70300100 Foot Short Term Pavement Marking Base Items 80.000 70300150 Sq Ft Short Term Pavement Marking Removal Base Items 27.000 78001110 Foot Paint Pavement Marking - Line 4" Base Items 1,687.000 78100100 Each Raised Reflective Pavement Marker Base Items 5.000 78300200 Each Raised Reflective Pavement Marker Removal Base Items 5.000 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |