Similar Projects
Electronic Arts Sports Office Building
New Construction - 180,000 SF
Conception
Orlando, FL 32801

Electronic Arts Sports Office Building
New Construction - 180,000 SF
Conception
Orlando, FL 32801

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Design
Orlando, FL 32805

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Design
Orlando, FL 32805

Development Partner for Development, Revitalization, or Rehabilitation
Results
Orlando, FL

City Center West Orange Apartments
New Construction - 323,000 SF
Construction
$18,000,000 est. value
Ocoee, FL 34761

City Center West Orange Master Plan
New Construction
Construction
$150,000,000 est. value
Ocoee, FL 34761

Mixed-Use Development and Hotel
New Construction
Conception
Orlando, FL 32822

Solis Orlando Resort, Capella Suites Hotel and Retail Complex
New Construction - 1,600,000 SF
Design
$500,000,000 est. value
Orlando, FL 32819

Coronado Townhomes
New Construction
Construction
Orlando, FL 32807

Townhomes at Westwood
New Construction
Conception
Orlando, FL 32821

Skyplex Rollercoaster Complex
New Construction, Demolition
Design
Orlando, FL 32819

Church Street Plaza Tower
New Construction - 601,225 SF
Construction
$81,000,000 est. value
Orlando, FL 32821

Apopka City Center - Master Plan
New Construction - 200,000 SF
Conception
$100,000,000 est. value
Apopka, FL 32703

5 New Hotels - Flamingo Crossings Master Plan
New Construction
Design
FL 34787

Last Updated 03/18/2019 03:41 PM
Project Title

Green District Master Plan

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Office, Parking Garage, Retail
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Master Planning, Site Analysis, Construction Start Expected first quarter 2020
Bids Due View project details and contacts
Estimated Value $300,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Parcel 1 - 6-story office building Parcel 2 - 1-story restaurant Parcel 3 - Jackson Court Apartments - a 8-story apartment building over a 4-level parking garage Parcel 4 - McCoy Apartments - a 4-story apartment building over a 3-level parking garage Parcel 6 - The Browns Apartments - a 4-story apartment building over a 4-story parking garage and an adjacent 9-story apartment building Parcel 7 - Wells Built Hotel, Casino and residential units - 12 story-hotel over a 3-story parking garage. Ground-Floor casino, with 2 stories of residential units above totaling 15 stories. Parcel 8 - City Place Apartments - a 4-story apartment building over a 1-level parking garage. Retail space facing Church Street.
Details 1,500,000 SF - Retail, 66,886 SF New Construction, Office, 129,585 SF New Construction, Apartments/Condominiums, New Construction, 464 Unit(s), 1 Hotel/Motel, New Construction 400 Unit(s), Parking Garage, New Construction, 780 Parking Spaces, 12 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Commercial Toilet Accessories, Bath Accessories, Residential Bath Accessories, Laundry Accessories, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Exterior Specialties, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Office Equipment, Residential Equipment, Residential Appliances, Residential Ceiling Fans, Foodservice Equipment, Foodservice Storage Equipment, Food Cooking Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Office Furniture, Retail Furniture, Hospitality Furniture, Hotel and Motel Furniture, Restaurant Furniture, Residential Furniture, Booths and Tables, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents