Similar Projects
Reported | 07/31/2021 12:00 AM |
Project Title | Asphalt Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Stanford, KY (Lincoln County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Completion Expected November 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1) Ready Mix Asphalt Surface 1.5”, 528’ Long, 18’ Wide L&W 2) Arrowhead Trail (from Cul-de-sac to end) Asphalt Surface 1.5”, 1100’ Long, 21’ Wide. 3) Choctaw (front side) Asphalt Surface 1.5”, 1150’ Long, 21’ Wide 4) Arrowhead Trail (Cul-de-sac) Asphalt Surface 1.5”, 80x80 (est) 5) Chickasaw Drive Asphalt Surface 1.5”, 1221’ Long, 21’ Wide 6) River Drive Asphalt Surface 1.5”, 950’ Long, 20’ Wide 7) Shawnee Trail Asphalt Surface 1.5”, 530’ Long, 18’ Wide. All Streets must have edge key milling for joints and intersectioning. All surfaces must be CL2.38D 64-22. Base CL2.75D 64-22. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |