Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Wood Trace Wastewater Treatment Plant - Phase 2 (0.270 MGD) and Lift Station Number 1 - Phase 2
New Construction
Bidding
TX

0.5 MGD Wastewater Treatment Plant Improvements and Reclaimed Water System
Renovation
Bidding
$4,950,000 est. value
Spring, TX 77379

Waste Water Treatment Plant Mitigation
Post-Bid
Orange, TX 77630

Granbury Wastewater Treatment Plant
Post-Bid
$27,000,000 est. value
Granbury, TX 76048

Contract 1 - Intake and Water Treatment Plant
Results
Less than $7,032,561 est. value
Mart, TX 76664

Wastewater Bar Screens for Houston Public Works
Results
Houston, TX 77013

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

West WWTP Expansion - PH I
Addition
Pending Verification
$1,200,000 est. value
Sugar Land, TX

Paw Paw Wastewater Treatment Plant Headworks and Miscellaneous Clarifier Improvements
Renovation
Bidding
$3,100,000 est. value
Denison, TX 75021

Wastewater Treatment Plant Rotor Repair
Post-Bid
Mercedes, TX 78570

Raw Water Supply and Distribution Additions to Edinburg WWTP Resevoir
Results
Edinburg, TX 78541

Dallas Salmon Wastewater Treatment Facility
Renovation
Pending Verification
League City, TX

Hornsby Bend Biosolids Management Plant Centrifuges
Alteration
Bidding
$8,070,060 est. value
Austin, TX

Last Updated 09/17/2021 09:47 AM
Project Title

Wastewater Treatment Plant Rehabilitation

Physical Address View project details and contacts
City, State (County) Hawkins, TX   (Wood County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements and modifications to the Wastewater Treatment Plant (WWTP) shall include the following: 1. Demolition of the existing grit system and installation of new grit system equipment including grit chamber mechanical equipment, grit pump, grit dewatering equipment, piping, electrical and controls, and associated appurtenances. 2. Removal and replacement of two (2) Aeration Basin surface mounted aerators, electrical and controls, and associated appurtenances. Removal and replacement of Aeration Basin effluent weir gate and associated appurtenances. Removal and proper disposal of all water, sludge, sediment, grit, and debris from Aeration Basin. 3. Removal and disposal of all water, sludge, sediment, grit, and debris from Final Clarifier No. 1. Removal and replacement of Final Clarifier No. 1 mechanism, walkway assembly, platform, handrails, weir panels, scum baffles, anchors, electrical and controls, and associated appurtenances. 4. Removal and replacement of Sludge Digester surface mounted aerator, center pier, walkway assembly, platform, handrails, electrical and controls, and associated appurtenances. Removal and replacement of Sludge Digester telescoping valve and associated appurtenances. Removal and proper disposal of all water, sludge, sediment, grit, and debris from Sludge Digester. 5. Removal and replacement of influent lift station plug valves, check valves, and necessary piping and fittings. 6. Removal and replacement of return sludge pump station plug valves, check valves, and necessary piping and fittings. 7. Abandonment of existing chlorination building and installation of a new chlorination building, chlorine storage and feed equipment, drain line, chlorine gas feed line, electrical and controls, and associated appurtenances. Removal and replacement of chlorine gas induction unit, crane, electrical and controls, and associated appurtenances. Removal and replacement of two (2) Chlorine Contact Chamber influent sluice gates and two (2) Chlorine Contact Chamber effluent sluice gates. 8. Abandonment of existing standby generator and installation of a new standby generator, foundation, sidewalks, electrical and controls, and associated appurtenances.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents