Similar Projects
Construction of Lift Station Generators For Exisiting Sites on the Fort Berthold Reservation
Renovation
Bidding
$98,000 CJ est. value
New Town, ND 58763

New Town 2023 Street and Utility Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
New Town, ND 58763

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Three Affiliated Tribes Elbowoods Memorial Health Center - Dental and Optometry Clinic
LEED Certification, New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
New Town, ND 58763

Pavement Marking
Infrastructure
Results
$307,945 CJ est. value
Mandaree, ND 58757

Chip Seal
Infrastructure
Results
$1,398,770 CJ est. value
Stanley, ND 58784

Stanley Pool Replacement - Bid Packages - General, Mechanical, and Electrical Construction
Demolition, New Construction, Infrastructure
Construction
$1,750,961 CJ est. value
Stanley, ND 58784

MWEC Warm Garage / New Town
New Construction, Infrastructure - 8,400 SF
Construction
$1,000,000 CJ est. value
New Town, ND 58763

Aux Sable Midstream Storage Building
New Construction, Infrastructure - 1,200 SF
Pending Verification
$600,000 CJ est. value
Palermo, ND 58769

Frontage Road Hotel
New Construction, Infrastructure - 108,000 SF
Pending Verification
$95,000,000 CJ est. value
New Town, ND 58763

Construction of Dragswolf Lift Station Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
New Town, ND 58763

MHA Nation - Four Bears Segment Four Bears Community Park
New Construction, Infrastructure
Post-Bid
$310,000 CJ est. value
Sanish, ND 58763

FBRW Subsequent Users and System Improvements
Infrastructure
Results
$2,820,343 CJ est. value
New Town, ND 58763

4 Bears Casino & Lodge
Addition, Demolition, Renovation, Infrastructure - 149,300 SF
Pending Verification
$95,000,000 CJ est. value
New Town, ND 58763

2024 Street Improvements
Infrastructure
Bidding
$1,800,000 CJ est. value
Parshall, ND 58770

Last Updated 02/14/2024 12:11 PM
Project Title

Booster Station Improvements

Physical Address View project details and contacts
City, State (County) Parshall, ND 58770   (Mountrail County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $663,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Pumps or Pump stations, Construction, Water Transmission Pipelines, Removal and Replacement of pipe Description: The project will consist of: Improvements to North Prairie's Booster Station, north of Parshall, North Dakota. Improvements include an approximate 60SF addition on the east side, upgraded pumps and piping within the facility, and reconnecting the exterior piping to newly constructed piping from the water tower as shown on the plans.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents