Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Solid Waste Flygt Pump
Post-Bid
FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

North Regional Water Reclamation Facility Master Reuse Wet Weather Management Well System
Results
Palmetto, FL 34221

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Raw Water Well #9
Results
Hallandale, FL 33009

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Wetwell, Tank and Pipe Cleaning and TV Inspection Services
Results
Jacksonville Beach, FL

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Saratoga Springs Plant Site Well Construction
Results
Green Cove Springs, FL

Last Updated 11/10/2021 02:08 PM
Project Title

Holly Hill Water Production Facility Upper Floridan Production Well No 2

Physical Address View project details and contacts
City, State (County) Davenport, FL 33837   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $768,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction and testing of one (1) Polk County Utilities m(PCU) water production well, which is located at the Holly Hill water production facility (WPF). The Contractor shall furnish all labor, equipment, material, services, and incidentals for construction and testing of the water production well as required by the Contract Documents. The completed well is anticipated to include approximately 200 feet of 36” diameter surface casing, 320 feet of 30” intermediate casing, 550 feet of 24” diameter inner casing, and a 24” diameter open hole to approximately 1,000 feet below land surface.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents