Similar Projects
RR061 - Gentilly Woods Group F (FRCPI)
Infrastructure
Bidding
New Orleans, LA

Port Allen Phase III Bulk Scale and Annex
Infrastructure
Post-Bid
$5,500,000 to $7,500,000 est. value
Port Allen, LA

Roadway Improvements
Infrastructure
Post-Bid
Jena, LA

Emergency Contingency Safety and Traffic
Infrastructure
Results
Baton Rouge, LA

La 13 - 2.7 Mi N La 14 - 0.2 Mi N Acadia P/L
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Crowley, LA 70527

Winfield Road Improvements
Infrastructure
Post-Bid
Bossier City, LA

I-10 Atch Basin BR W Baton Rouge P/L
Infrastructure
Results
Lafayette, LA

Downtown Loop Pavement Replacement Phase 2
Infrastructure
Post-Bid
New Orleans, LA

Lafourche - Terrebonne Scenic Overlook
Infrastructure
Results
$100,000 to $250,000 est. value
LA

Ac-10 Asphalt, Mc-30 Prime, Asphalt Emulsion Prime
Infrastructure
Post-Bid
Farmerville, LA

LA 465: LA 8 - LA 28
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Cold Mix (Colay) and Hot Mix
Infrastructure
Post-Bid
Farmerville, LA

LA 128: LA 573 - US 65
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Cold Mix
Infrastructure
Post-Bid
Saint Martinville, LA

US 90: Cameron St. Overlay
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Reported 04/22/2022 12:00 AM
Project Title

Burns Street Gravity Sewer Main Replacement and Roadway Reconstruction

Physical Address View project details and contacts
City, State (County) Pineville, LA   (Rapides County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the in-place reconstruction of approximately 1,600 L.F. of 8" sanitary sewer mains, services and 8 sewer manholes. The project also includes the reconstruction of Burn Street from Creed Street to College Drive with P.C.C. pavement, curb and sub-surface drainage. The project also includes milling and overlay with 2" HMAC of Burns Street from College Drive to College Street and replacement of curb and gutter sections. The project also includes removal and replacement of utility services and utility mains as directed or required. New sewer mains are in the range of 10-14 feet deep.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents