Similar Projects
Last Updated | 01/12/2022 08:30 AM |
Project Title | Bedford Elementary School Roof Recovering and HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | Bedford, VA 24523 (Bedford County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC, Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Bedford Elementary School Roof Recovering and HVAC Replacement project generally consists of the demolition and replacement of the existing HVAC systems and roofing for the building(s). The project also includes limited electrical upgrades as necessary to accommodate the new mechanical equipment. The mechanical upgrades include the replacement of approximately 35 Fan-Powered VA V boxes, 9 rooftop AC units, a new heating water boiler and pumps, a new domestic water heater, a new BAS system, and propane tanks with associated piping to supply both the heating water boiler and domestic water boiler. The roofing replacement includes the removal and disposal of existing ballast stone, demolition of existing roof membrane and associated edge metal, selective demolition and replacement of wet/damaged insulation, installation of new recovery board, installation of new adhered single ply roof membrane and associated edge metal. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |