Similar Projects
Field House - 47232784 - City of Lees Summit
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Lees Summit, MO 64063

Fire Station 5 Replacement - 828TBD74 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Lees Summit, MO 64082

Sturgeon and Rollins Water Main Replacement
Infrastructure
Design
$1,697,230 CJ est. value
Moberly, MO 65270

The Flats at Forest Park
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Saint Louis, MO 63115

RFP D/B - New Passenger Terminal Building at the Cape Girardeau Regional Airport
New Construction, Infrastructure - 20,000 SF
Bidding
$12,000,000 CJ est. value
Cape Girardeau, MO 63701

Pivotal Point Transitional Housing
New Construction, Infrastructure - 7,027 SF
Bidding
$1,500,000 CJ est. value
Saint Joseph, MO 64506

The Rail Apartments - Casework, Cabinetry, and Countertops
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Saint Louis, MO 63110

The Rail Apartments - Site Utilities
Infrastructure
Sub-Bidding
$350,000 CJ est. value
Saint Louis, MO 63110

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Excavation and Site Work
Infrastructure
Results
Lebanon, MO

La-Z-Boy Plant Expansion
Addition - 60,480 SF
Pending Verification
$5,000,000 to $8,000,000 est. value
Neosho, MO 64850

Kinsley Forest Apartments - Phase 2
New Construction, Infrastructure
Pending Verification
$132,000,000 CJ est. value
Kansas City, MO 64118

Budd Park Walking Path - City of Kansas City
Infrastructure
Conception
$266,000 CJ est. value
Kansas City, MO 64123

Last Updated 08/16/2022 04:34 PM
Project Title

True Manufacturing / Popular Bluff

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $21,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 19, 2022, the project is in planning. The site plan has been submitted into the City of Poplar Bluff and is under review. No building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however, construction is not expected to begin prior to late 2022. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents