Similar Projects
Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Roof Top Unit Replacements (5 sites) - 2022 Bond - Northside Independent School District
Infrastructure
Conception
$9,400,000 CJ est. value
San Antonio, TX 78205

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

Waterwheel Booster Pump Station
New Construction
Post-Bid
San Antonio, TX

Lift Stations Rehabilitation - Phase 5 Project
Renovation
Results
$9,933,508 est. value
San Antonio, TX 78275

Woman Hollering Creek Sanitary Sewer Project
New Construction, Infrastructure
Results
$10,567,170 est. value
Schertz, TX

Package 2 SAWS NE Operation Center and NE Service Center
New Construction, Infrastructure
Construction
$250,000 CJ est. value
San Antonio, TX 78205

Waters Edge I / Building A
New Construction, Infrastructure - 105,702 SF
Construction
$18,600,000 CJ est. value
San Antonio, TX 78235

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Springhill Suites by Marriott / San Antonio North
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Post-Bid
$22,880,631 CJ est. value
San Antonio, TX 78204

Last Updated 05/16/2023 02:44 PM
Project Title

E-54 Regional Lift Station

Physical Address View project details and contacts
City, State (County) Von Ormy, TX 78073   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this solicitation will include the installation of an approximate 6 MGD sanitary sewer lift station The project is located in the Edwards Aquifer Recharge Zone on the North side of San Antonio, south of Evans Road. The construction scope of this project includes: Construction of a 6 MGD sanitary sewer lift station including but not limited to: construction of wet well, submersible pumps, electronic instrumentation, pump controls, SCADA communication equipment, station piping, electrical building, and other associated improvements for a complete in-place facility. Decommissioning three (3) existing SAWS lift stations (LS#235 Fossil Ridge, LS#297 Fischer, and LS#236 Fox Grove). 127 LF of 24-inch, 44 LF of 21-inch, 67 LF of 12-inch, and 136 LF of 8-inch gravity sewer main and associated manholes via open-cut trenching. Pipe installation and lift station wet well excavation in limestone rock. For questions regarding this solicitation, technical questions, or additional information, please contact Lindsay Esquivel, Contract Administrator, in writing via email to lindsay.esquivel@saws.org or by fax to 210-233-4236 until 4:00 PM (CDT) on April 20, 2023. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on April 27, 2023, as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. See the Electronic Proposal Opening Instructions attachment for additional information regarding an electronic proposal submittal. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Use the chat feature to ask questions, or ask questions through email to Roxanne.Lockhart@saws.org The estimated budget is $12,000,000.00. Construction duration is 825 calendar days. 20.00% M/WBE Goal; 5% SBE Goal Answers to the questions will be posted to the web site by 4:00 PM (CDT) on April 27, 2023 For questions regarding this solicitation, technical questions, or additional information, please contact Lindsay Esquivel, Contract Administrator, in writing via email to lindsay.esquivel@saws.org or by fax to 210-233-4236 *Keystone Construction Inc. requests bids be submitted to: estimating@keystoneconstruct.com no later than May 10, 2023 at 12:00 PM

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents