Similar Projects
US 29 Pedestrian and Bicycle Improvements - P502304 - Montgomery County
Infrastructure
Conception
$4,500,000 CJ est. value
Bealeton, VA 22712

US 29 Pedestrian and Bicycle Improvements - P502304 - Montgomery County
Infrastructure
Conception
$4,500,000 CJ est. value
Bealeton, VA 22712

Heritage of Marshall Residences
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Marshall, VA 20115

Milling and Asphalt Paving
Infrastructure
Bidding
$480,000 CJ est. value
Warrenton, VA 20186

Milling and Asphalt Paving
Infrastructure
Bidding
$480,000 CJ est. value
Warrenton, VA 20186

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

Amazon Data Center / Warrenton
New Construction, Infrastructure - 220,000 SF
Pending Verification
$60,000,000 CJ est. value
Warrenton, VA 20186

Amazon Data Center / Warrenton
New Construction, Infrastructure - 220,000 SF
Pending Verification
$60,000,000 CJ est. value
Warrenton, VA 20186

Strickland Brothers Oil Change #553
New Construction - 1,725 SF
Post-Bid
Warrenton, VA 20186

2022 Surface Treatment
Infrastructure
Results
$875,000 est. value

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

2022 Slurry Seal
Infrastructure
Results
$2,715,000 est. value

Last Updated 02/22/2023 10:39 AM
Project Title

Harris Teeter Service Station Store #329 / Town of Warrenton

Physical Address View project details and contacts
City, State (County) Warrenton, VA 20186   (Fauquier County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Zoning Map Amendment and Special Use Permit was presented to the Warrenton Planning commission August 2022 and was denied. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents