Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

HVAC Replacement/Installation
Results
Gainesville, FL 32609

Air Handling Unit Replacement at Fine Arts D
Results
Gainesville, FL 32601

H341--Clean Air Handling Units (AHUs) and Heat Recovery Units
Post-Bid
Gainesville, FL

Chilled Water Pipe Replacement at Dental Science Building Floors 5, 6, 7 and 8
Results
Gainesville, FL 32610

Microbiology Re-Roof and Exhaust Fan Replacement - Phase 1
Post-Bid
Gainesville, FL 32603

HVAC Cleaning and Decontamination Services
Results
Gainesville, FL 32601

Oak Park HVAC Replacement
Post-Bid
Gainesville, FL

IFAS Fifield Hall Chiller
Results
Gainesville, FL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Design-Build for the HVAC System at Camp Cuscowilla
Results
Micanopy, FL 32667

4120--Replacement of AHU-24 Fan & Coil Compartment
Term Contract
Post-Bid
Gainesville, FL 32608

Rooftop Unit (RTU) Replacement
Results

6515--FY21: Install E-Wing CW Water Treatment System
Term Contract
Post-Bid
Gainesville, FL 32608

Last Updated 03/21/2022 02:39 PM
Project Title

4120--Equipment: Replace AHU-24

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: • Coordinate all work with the Contracting Officer (CO), Contracting Officers Representative (COR) and Engineering Operations Supervisor (EOS). • Conduct T&B at AHU and each floor to determine airflow prior to replacement and after replacement. • Lock and tag out all electrical service to unit. • Lock and tag out all CW and steam supply to the unit. • Disconnect existing BAS and Fire Alarm circuits from unit. • Remove existing AHU-24 blower and coil compartment and dispose of material. • Remove existing humidifier steam piping back to first shutoff valve. • Remove and replace existing pneumatically operated 3-way CW control valve with new 2-way DDC operated CW control valve. • Remove and replace existing pneumatically operated steam preheat control valve with new DDC operated steam preheat control valve. • Install new AHU-24, reconfiguring CW and steam line connections as required. • Insulate all CW and steam piping. • Plumb in new condensate drain lines to existing floor drains in the space. • Connect new controls to Siemens Desigo BAS, including the update of existing graphics, alarming points and updating trends. • Provide and install SA and RA/OA temp and humidity sensors. • Provide and install SA static pressure sensors. • Commission the new AHU to prove the sequence of operations, alarms, trends, and unit shutdown for any safeties (i.e., LTD, smoke/fire, High static pressure of low static pressure. • Provide four (4) hours of training to HVAC Shop maintenance personnel on maintenance, operation and control for new AHU-24. • Provide a minimum one (1) year warranty of all parts and labor. • Contractor responsible for removal of all construction debris/material. • The project must be performed by a contractor that has the capability and capacity to perform all tasks. A New AHU-24 blower/coil assembly must fit current footprint. Expect delivery within 90 days of award.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents