Similar Projects
DRA Sewer Improvements
Post-Bid
Heidelberg, MS

Phase I Sewer Rehab Project
Post-Bid
Wiggins, MS

Walnut Grove Sewer Rehabilitation - Phase I
Post-Bid
Walnut, MS

Highway 15 Corridor Sewer Phase 1 Infrastructure Project
Post-Bid
D'Iberville, MS

Brandon Avenue Sanitary Sewer Improvements (Phase I)
Post-Bid
Richland, MS 39218

Miscellaneous Services/Repairs Agreement
Post-Bid
Biloxi, MS

Daisy Street Force Main
Bidding
Natchez, MS 39120

Ratliff Ferry Sewer Improvements
Bidding
Canton, MS 39046

Wastewater Collection System
Bidding
Holly Springs, MS

Airport Storm Drain and Sanitary Sewer
Bidding
Bolton, MS 39041

Sewer Main Rehabilitation – Phase One
Bidding
West Point, MS

Reported 04/17/2021 12:00 AM
Project Title

SR 6 Sanitary Sewer Crossing Force Main Relocation

Physical Address View project details and contacts
City, State (County) Marks, MS   (Quitman County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist essentially of the following type items: 1. Installation of 20” Steel Casing Pipe with 12” C900 PVC Carrier Pipe. 2. Installation of 12” C900 PVC Sewer Main 3. Connection to Existing 12” PVC Sewer Force Main Pipe. 4. Existing 18” PVC Force Main Abandonment.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents