Similar Projects
Compton Community College Visual & Performing Arts Building
New Construction
Conception
$9,000,000 to $10,000,000 est. value
Compton, CA 90221

Compton Community College Student Housing
New Construction
Conception
$69,490,000 est. value
Compton, CA 90221

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Design
$4,000,000 CJ est. value
Los Angeles, CA 91401

Video Surveillance, Paging and Wireless Upgrade
Renovation
Design
$225,497 CJ est. value
Fresno, CA 93741

Technology and Health Increment 1
Term Contract, Demolition, New Construction, Infrastructure - 253,866 SF
Bidding
$120,000,000 CJ est. value
Walnut, CA 91789

Blanket Advertisement for Various Minor Capital Construction Projects (Not for a Specific Project)
Term Contract
Bidding
Carson, CA 90745

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

College of Alameda Construction Management Services Aviation Modernization Phase 2
Renovation, Alteration
Post-Bid
Oakland, CA 94606

CLA Tower And Registration Buildings Demolition Project
Demolition, Infrastructure
Results
$9,068,000 est. value
Pomona, CA 91768

Bakersfield College Delano Center LRC Multi-Purpose Building Project
New Construction
Results
$24,000,000 est. value
Bakersfield, Delano, CA 93314

Butte Hall Replacement Project
Demolition, New Construction, Infrastructure - 89,075 SF
Construction
$78,000,000 CJ est. value
Chico, CA 95929

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Pending Verification
$60,000,000 CJ est. value
Los Angeles, CA 91401

Samuel Merritt University New Campus
New Construction, Infrastructure - 240,000 SF
Pending Verification
$100,000,000 CJ est. value
Oakland, CA 94607

Faculty Office Building - California State University - Bakersfield
New Construction
Conception
$15,684,000 est. value
Bakersfield, CA 93311

3 R's Townhomes
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
San Rafael, CA 94903

Last Updated 02/06/2023 12:09 PM
Project Title

Acker/Shurmer Gym Classroom/Faculty Office Renovation - Phase II - California State University - Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95928   (Butte County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $41,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will renovate 69,000 ASF/95,000 GSF of existing space in Acker and Shurmer Gymnasiums (#9 and 20), and convert space to meet programmatic needs and single-faculty office standards. This project will create seven new faculty offices and renovate the existing 15 offices, which previously accommodated two faculty per office. Faculty office needs will be accommodated in the new classroom/faculty office/laboratory (Modoc II) (#108) building. At completion, this facility will provide a net loss of eight faculty offices. As of February 6, 2023, this project is currently in the California State University's FY 2020/2021 - 2024/2025 CIP. Information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

95,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents