Similar Projects
Sanitary Sewer to serve Tru-Building Addition
Infrastructure
Bidding
$300,000 CJ est. value
Wichita, KS 67202

Water Distribution System to Serve Turkey Creek 4th Addition Phase 1B
Infrastructure
Bidding
$700,000 CJ est. value
Wichita, KS 67202

Above Ground Below Ground Storage Tank Maintenance
Term Contract
Post-Bid
McConnell AFB, KS

Water, Sewer, and Storm Water for Cedar Ranch Estates Phase 2
Infrastructure
Post-Bid
$500,000 CJ est. value
Derby, KS 67037

Valley Center Water Tower Rehabilitation
Infrastructure
Results
Valley Center, KS

Grading and Surfacing. Bel Aire: Woodlawn St From 37th St Thru 45th St Intersection In Sg Co. Lgth Is 1.051 Mi
Infrastructure
Results
KS

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Siding Rehabilitation and Expansion - State of Kansas
Infrastructure
Pending Verification
$664,756 CJ est. value
Wichita, KS 67202

Blayke Court to Serve Cooper Creek Addition
Infrastructure
Bidding
$2,000,000 CJ est. value
Wichita, KS 67202

Cherese Woods Addition Street Improvements - Phase 2
Infrastructure
Results
$2,000,000 est. value
Wichita, KS

Siding Rehabilitation - State of Kansas
Infrastructure
Pending Verification
$231,015 CJ est. value
Wichita, KS 67202

Water Distribution System to serve Clear Ridge Addition Phase 2
Infrastructure
Bidding
$700,000 CJ est. value
Wichita, KS 67202

Wichita Hillside Area Shop Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Results
$1,317,000 CJ est. value
Wichita, KS 67219

Rail Replacement - State of Kansas
Infrastructure
Pending Verification
$1,440,000 CJ est. value
Wichita, KS 67202

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

Last Updated 07/28/2022 02:38 AM
Project Title

300,000 Gallon Water Tower

Physical Address View project details and contacts
City, State (County) Mulvane, KS 67110   (Sedgwick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project No: 35-217024-004-4597 Construction of a new 300,000 Gallon Water Tower and associated piping, site improvements, and electrical and SCADA installation. Submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Professional Engineering Consultants, P.A. 303 S. Topeka, Wichita, Kansas 67202. Ryan Glessner, P.E. ryan.glessner@pec1.com 316-262-2691

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents