Similar Projects
Unit Upgrades, 48 Fairbank Circle 705-4
Bidding
$40,000 est. value
Sudbury, MA

On-Call Tub Refinishing Repairs
Bidding
$20,000 est. value
Lowell, MA

Weston Manor Shower Surrounds Installation
Post-Bid
Less than $75,000 est. value
Somerville, MA 02145

Shower Surround Installations at Various Developments
Post-Bid
Less than $99,000 est. value
Somerville, MA 02145

Crocker Hall Interior Renovations Phase 1 - General Bids
Results
Less than $660,000 est. value
Framingham, MA

Moisture Remediation Repairs
Results
$50,000 to $150,000 est. value
Framingham, MA 01701

Office Renovations Hale Middle School
Bidding
$80,000 est. value
Stow, MA 01775

Bryant Manor Shower Surrounds Installation
Post-Bid
Less than $95,000 est. value
Somerville, MA 02145

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Ceiling Tiles Removal and Replacement
Bidding
$515,000 est. value
Wilmington, MA 01887

Alterations for Buildings and Grounds at Farley - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

Costello Basketball Suite Project - Filed Sub-Bids
Results
$3,000,000 est. value
Lowell, MA

Access Control Partitions
Post-Bid
Natick, MA 01760

Central Acton Water Treatment Plant Contract 1 - Filed Sub-Bids
Results
$6,800,000 est. value
Acton, MA 01720

Belmont Fire Department Headquarters Interior Repairs
Post-Bid
Less than $50,000 est. value
Belmont, MA 02478

Last Updated 07/24/2020 12:39 PM
Project Title

Select Bedroom Conversion

Physical Address View project details and contacts
City, State (County) Somerville, MA 02143   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of six (6) auxiliary corridor spaces to second bedrooms for existing apartment dwelling units at Weston Manor Apartments

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Wood Doors, Composite Doors, Bifolding Composite Doors, Door Hardware.
Division 09 - Finishes, Gypsum Board, Resilient Flooring, Resilient Base and Accessories, Acoustic Insulation, Painting.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents