Similar Projects
Cove Drive and Sol Avenue Roadway Improvements Project
Infrastructure
Bidding
$492,289 est. value
Belle Isle, FL 32812

Resurfacing - SR 520
Infrastructure
Bidding
$11,461,127 est. value
FL

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

Construction Manager at Risk Services Creative Village - Central Park and Roadway Improvements
Results
Less than $4,000,000 est. value
Orlando, FL 32802

Shingle Creek Regional Trail Phase 2 (from Town Loop Boulevard to Taft-Vineland Road at Central Florida Parkway) FPID: 439878-58-01 FAN: D519-015-B
Results
$5,401,637 est. value
FL

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Asphalt Repair
Infrastructure
Bidding
$1,430,000 est. value
FL

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Post-Bid
Winter Park, FL

S.R. 538 Poinciana Parkway Widening from Ronald Reagan Parkway to Cypress Parkway
Results
Orlando, FL 32807

Resurfacing - SR 500/US 441
Infrastructure
Bidding
$7,188,678 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Vineland Avenue and S.R. 535 (Kissimmee-Vineland Road) Intersection Improvements
Results
Less than $1,498,823 est. value
Orlando, FL 32821

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Bidding
$13,057,755 est. value
Orlando, FL

Last Updated 11/19/2021 07:27 AM
Project Title

SR 429 Widening from West Road to SR 414

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $107,856,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing all labor, materials, equipment, and incidentals necessary to widen SR 429 from West Road to SR 414 from four (4) general use lanes to six (6) general use lanes. Specifically, the project consists of widening to the inside (median) to accommodate an additional general use travel lane in each direction with full depth shoulders for a portion of the remainder of median areas to facilitate hard shoulder running in the future. Also included is a bridge replacement at CR 437A as well as all the widening of the other mainline bridges within the project limits to accommodate the appropriate shoulder widths, additional general use lanes and ramp modifications as shown in the bidding documents. The work also includes, but is not limited to, construction of sound barriers, overhead sign structures and intelligent transportation systems infrastructure in Orange county

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents