Similar Projects
63--Security Upgrades
Post-Bid
Fort Hood, TX 76544

Campus Wide Roof Renovations Package 3
Post-Bid
Prairie View, TX

Bay City High School - Roof Recover Project
Results
Less than $1,962,431 est. value
Bay City, TX 77414

Citywide Roofing Services
Results
Austin, TX 78767

Roofing Repair and Maintenance
Post-Bid

Rosendo Benavides Elementary School Roof & Building Envelope Renovations
Results
Sullivan City, TX 78595

Reroofing at Thompson Middle School
Post-Bid
Quinlan, TX 75474

Roofing Improvements at Graham Elementary School
Results
Less than $700,000 est. value
Austin, TX 78753

Gonzalez Tsvh and Guillen Tsvh - Roofing
Alteration
Post-Bid
$120,000 est. value
McAllen, TX 78711

Roofing Repair Supplies
Term Contract
Results
San Antonio, TX 78208

Building 545, Science Engineering and Research Center HVAC Upgrades and Roof Replacement
Alteration
Post-Bid
Houston, TX 77204

Roofing Repairs at Dawson Elementary School
Results
$859,550 est. value
Austin, TX 78704

Roof Replacement, Victoria AEM
Results
Less than $50,000 est. value
Victoria, TX 77905

San Antonio General McMullen DL Roof
Results
Less than $91,685 est. value
San Antonio, TX 78237

Roof Replacement at Villas By The Park Apartments
Results
$339,485 est. value
Fort Worth, TX

Last Updated 09/14/2021 10:38 AM
Project Title

3333 N. Mesa Roof Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79902   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The location of the project site is: 3333 N. Mesa St., El Paso, TX 79902. The approximate square footages are provided for the convenience of the bidding contractors. Contractors shall verify all measurements on the roof. Differences in square footages from those published here shall not generate change orders. Please notify UTEP Planning & Construction if you find any large discrepancy in square footages. Main roof + Penthouse roof = 34,000 SF. 2. Remove existing roofing system, BUR and insulation down to metal deck. 3. Remove all existing flashings and base tie-ins for BUR roof system. 4. Waste materials, debris, etc. shall be properly disposed of daily. Contractor is to provide their own dumpster at Contractor cost. Project site must remain clean and rubbish free at all times.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents