Similar Projects
Grade, Drain, Bridge and Surface
Infrastructure
Design
$40,000,000 CJ est. value
Tahlequah, OK 74464

Resurface
Infrastructure
Design
$1,000,000 CJ est. value
Tahlequah, OK 74464

RFP Design - Site Development - Pre-Construction Design Phase
Infrastructure
Bidding
$50,000 CJ est. value
Tahlequah, OK 74464

Mission Park Trails
Infrastructure
Bidding
$125,000 CJ est. value
Tahlequah, OK 74464

Briggs Public Schools Lower Gymnasium Renovation Rebid
Addition, Renovation, Infrastructure - 7,760 SF
Sub-Bidding
$1,500,000 CJ est. value
Tahlequah, OK 74464

4th Street Parking Lot Sealcoat and Re-Stripe
Infrastructure
Post-Bid
$300,000 CJ est. value
Tahlequah, OK 74464

Middle School Addition
Demolition, New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Tahlequah, OK 74464

Ross Street Improvements and Cedar Avenue Improvements
Infrastructure
Results
$2,271,647 CJ est. value
Tahlequah, OK 74464

Water Line Relocation
Infrastructure
Results
$411,225 CJ est. value
Tahlequah, OK 74464

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

Utilities - SH 100
Infrastructure
Design
$2,000,000 CJ est. value
Cookson, OK 74427

Speaker Village Site Work and Utilities
Infrastructure
Bidding
$1,000,000 CJ est. value
Tahlequah, OK 74464

Construction of 2-inch HDPE Pipeline
Infrastructure
Post-Bid
$70,000 CJ est. value
Hulbert, OK 74441

Utilities - SH 82
Infrastructure
Design
$1,840,000 CJ est. value
Tahlequah, OK 74464

Last Updated 02/17/2023 03:28 PM
Project Title

Lake Region Electric Cooperative - Phase 1

Physical Address View project details and contacts
City, State (County) Hulbert, OK 74441   (Cherokee County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 15, 2023, Cowen Construction has been awarded the role of Construction Manager for a multi-project master plan of expansion to Lake Region Electric Cooperative headquarters. Construction is underway, however, an exact timeline for construction has not been confirmed. No further inquiries to be accepted. - Expand existing warehouse and add additional loading docks. - Expand existing warehouse mezzanine and offices. - Reconfigure existing locker and break room. - New entry drive. Base bid is to include, but not limited to the following: - Provide Demo as Shown - Provide and Install new HVAC Systems - Provide and Install new Fans - Provide and Install new Heaters - Provide, Modify, and Install all Air Duct Insulation *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents